Tires, Elastomers & Technical Rubber VSM Scenarios

12 scenarios of Tires, Elastomers & Technical Rubber, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Internal Intensive Carbon Mix → Calender, Tread Extrude & Ply → Steam Bladder Cure Press → Trim, X-Ray & Uniformity Check → Barcode Grading & Pallet Stack. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Silica-Compounded UHP Passenger Radial Tire4,800 units per day316.9 s9.30 d0.009%2-Stage Robotic Tire Building
Micro-Wave Co-Extruded EPDM Car Door Weatherstrip9,500 parts per day38.5 s9.30 d0.004%Waterborne Flock Adhesive Spray
Cryo-Deflashed FKM Aerospace O-Rings48,000 parts per day21.1 s9.30 d0.001%Post-Cure 230°C Oven Bake
Dual-Former Cleanroom Powder-Free Nitrile Glove140,000 units per day30.6 s9.30 d0.001%Chlorination & Double Rinse
Steel-Cord ST-4500 Heavy Mining Conveyor Belt18 batches per day34,500 s9.50 d2.3%20m Hydraulic Step-Cure Press
Hydro-Elastic Aluminum/Rubber Engine Mount2,400 units per day222.5 s9.30 d0.018%Vacuum Glycol Fill & Swage
Raw-Edge Cogged Aramid Automotive Serpentine Belt8,500 units per day26.4 s9.30 d0.005%Steam Autoclave Sleeve Cure
3-Compound Press-On Solid Cushion Forklift Tire380 units per day2142 s9.31 d0.11%Heavy Hydraulic Daylight Cure
Aramid-Reinforced Twin-Sphere Pipe Bellows280 units per day2193 s9.31 d0.15%Steam Press Mold Vulcanize
Talalay Natural Latex Breathable Mattress Core190 units per day2284 s9.32 d0.22%CO2 Gel & 115°C Steam Cure
Braided Steel Reinforced High-Pressure Hose Line42 batches per day31,929 s9.40 d1.00%Pin-Pricked CR Outer Jacket
Graphite-Coated Precision Extruded Wiper Strip24,000 parts per day33.4 s9.30 d0.002%Halogen Chlorine & Graphite Dip