Braided Steel Reinforced High-Pressure Hose Line
Product family: SAE 100R2 Mandrel Hydraulic.
Flow: NBR Inner Tube & Brass Wire → Nylon Mandrel Inner Tube Ext → 24-Spindle High-Speed Wire Braid → Pin-Pricked CR Outer Jacket → Lead/Autoclave Steam Cure → Water Impulse & Mandrel Eject → Hydraulic Crimping Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Nylon Mandrel Inner Tube Ext | 1,350 s | 35 min | 94% | 98.4% | 63 | 76 (1.81 d) | 55 |
| 2. 24-Spindle High-Speed Wire Braid | 1,620 s | 30 min | 91% | 97.6% | 34 | 67 (1.60 d) | 43 |
| 3. Pin-Pricked CR Outer Jacket | 2,083 s | 40 min | 84% | 95.8% | 42 | 88 (2.10 d) | 30 |
| 4. Lead/Autoclave Steam Cure | 1,466 s | 15 min | 93% | 98.0% | 17 | 46 (1.10 d) | 49 |
| 5. Water Impulse & Mandrel Eject | 1,080 s | 8 min | 97% | 99.4% | 13 | 38 (0.90 d) | 71 |
Key figures
- Takt time
- 1,929 s
- Lead time
- 9.40 d
- Value-added time
- 7,599 s
- Process cycle efficiency (PCE)
- 1.00%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 42 batches
- Line capacity per day
- 30 batches
- Bottleneck
- Pin-Pricked CR Outer Jacket
Reading the bottleneck
The bottleneck is "Pin-Pricked CR Outer Jacket": it can process 30 batches per day against a demand of 42 batches, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,588 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Tires, Elastomers & Technical Rubber: Tires, Elastomers & Technical Rubber
- Silica-Compounded UHP Passenger Radial Tire
- Micro-Wave Co-Extruded EPDM Car Door Weatherstrip
- Cryo-Deflashed FKM Aerospace O-Rings
- Dual-Former Cleanroom Powder-Free Nitrile Glove
- Steel-Cord ST-4500 Heavy Mining Conveyor Belt
- Hydro-Elastic Aluminum/Rubber Engine Mount
- Raw-Edge Cogged Aramid Automotive Serpentine Belt
- 3-Compound Press-On Solid Cushion Forklift Tire
- Aramid-Reinforced Twin-Sphere Pipe Bellows
- Talalay Natural Latex Breathable Mattress Core
- Graphite-Coated Precision Extruded Wiper Strip