Steel-Cord ST-4500 Heavy Mining Conveyor Belt
Product family: Fire-Resistant Aramid/Steel Belt.
Flow: Brass Steel Cord Supplier → 120-Cord Tension Creel Comb → Top/Bottom Skim Calender → 20m Hydraulic Step-Cure Press → Edge Trim & Splice Prep Kit → DIN-K Fire & Adhesion Audit → Open-Pit Copper & Coal Mines
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 120-Cord Tension Creel Comb | 3,150 s | 35 min | 94% | 98.4% | 27 | 32 (1.78 d) | 23 |
| 2. Top/Bottom Skim Calender | 3,780 s | 30 min | 91% | 97.6% | 14 | 29 (1.61 d) | 18 |
| 3. 20m Hydraulic Step-Cure Press | 4,860 s | 40 min | 84% | 95.8% | 18 | 38 (2.11 d) | 13 |
| 4. Edge Trim & Splice Prep Kit | 3,420 s | 15 min | 93% | 98.0% | 7 | 20 (1.11 d) | 21 |
| 5. DIN-K Fire & Adhesion Audit | 2,520 s | 8 min | 97% | 99.4% | 5 | 16 (0.89 d) | 30 |
Key figures
- Takt time
- 4,500 s
- Lead time
- 9.50 d
- Value-added time
- 17,730 s
- Process cycle efficiency (PCE)
- 2.3%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 18 batches
- Line capacity per day
- 13 batches
- Bottleneck
- 20m Hydraulic Step-Cure Press
Reading the bottleneck
The bottleneck is "20m Hydraulic Step-Cure Press": it can process 13 batches per day against a demand of 18 batches, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,039 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 926 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Tires, Elastomers & Technical Rubber: Tires, Elastomers & Technical Rubber
- Silica-Compounded UHP Passenger Radial Tire
- Micro-Wave Co-Extruded EPDM Car Door Weatherstrip
- Cryo-Deflashed FKM Aerospace O-Rings
- Dual-Former Cleanroom Powder-Free Nitrile Glove
- Hydro-Elastic Aluminum/Rubber Engine Mount
- Raw-Edge Cogged Aramid Automotive Serpentine Belt
- 3-Compound Press-On Solid Cushion Forklift Tire
- Aramid-Reinforced Twin-Sphere Pipe Bellows
- Talalay Natural Latex Breathable Mattress Core
- Braided Steel Reinforced High-Pressure Hose Line
- Graphite-Coated Precision Extruded Wiper Strip