Micro-Wave Co-Extruded EPDM Car Door Weatherstrip

Product family: Velvet-Flocked Acoustic Seals.

Flow: EPDM & Metal Carrier Supplier → Quad-Die Steel Carrier Co-Ext → UHF Microwave + Hot Air Cure → Waterborne Flock Adhesive Spray → Corner Molded Injection Join → Cut-to-Length Camera Gauge → Automotive Door Tier-1

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Micro-Wave Co-Extruded EPDM Car Door WeatherstripSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. EPDM & Metal Carrier Supplier → Quad-Die Steel Carrier Co-Ext (6.0 s) → UHF Microwave + Hot Air Cure (7.2 s) → Waterborne Flock Adhesive Spray (9.2 s) → Corner Molded Injection Join (6.5 s) → Cut-to-Length Camera Gauge (4.8 s) → Automotive Door Tier-1.SUPPLIEREPDM & MetalCarrierSupplierI1.80 d1Quad-Die SteelCarrier Co-ExtC/T 6.0 sI1.60 d2UHF Microwave +Hot Air CureC/T 7.2 sI2.10 d3Waterborne FlockAdhesive SprayC/T 9.2 sI1.10 d4Corner MoldedInjection JoinC/T 6.5 sI0.90 d5Cut-to-LengthCamera GaugeC/T 4.8 sI1.80 dCUSTOMERAutomotive DoorTier-19,500 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Quad-Die Steel Carrier Co-Ext6.0 s35 min94%98.4%14,25017,100 (1.80 d)12,271
2. UHF Microwave + Hot Air Cure7.2 s30 min91%97.6%7,60015,200 (1.60 d)9,714
3. Waterborne Flock Adhesive Spray9.2 s40 min84%95.8%9,50019,950 (2.10 d)6,875
4. Corner Molded Injection Join6.5 s15 min93%98.0%3,80010,450 (1.10 d)11,042
5. Cut-to-Length Camera Gauge4.8 s8 min97%99.4%2,8508,550 (0.90 d)15,949

Key figures

Takt time
8.5 s
Lead time
9.30 d
Value-added time
33.7 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
9,500 parts
Line capacity per day
6,875 parts
Bottleneck
Waterborne Flock Adhesive Spray

Reading the bottleneck

The bottleneck is "Waterborne Flock Adhesive Spray": it can process 6,875 parts per day against a demand of 9,500 parts, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 9.2 s to 11.4 s, against a takt of 8.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.