Aramid-Reinforced Twin-Sphere Pipe Bellows

Product family: Potable Water Flanged Joints.

Flow: Butyl / EPDM & Galvanized Rings → Mandrel Ply Build & Bead Wire → Hand Lay Outer Abrasion Cover → Steam Press Mold Vulcanize → Carbon Steel Split Flange Fit → 30-Bar Hydro & Burst Audit → HVAC & Pumping Stations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Aramid-Reinforced Twin-Sphere Pipe BellowsSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Butyl / EPDM & Galvanized Rings → Mandrel Ply Build & Bead Wire (135 s) → Hand Lay Outer Abrasion Cover (162 s) → Steam Press Mold Vulcanize (208 s) → Carbon Steel Split Flange Fit (147 s) → 30-Bar Hydro & Burst Audit (108 s) → HVAC & Pumping Stations.SUPPLIERButyl / EPDM &GalvanizedRingsI1.80 d1Mandrel Ply Build& Bead WireC/T 135 sI1.60 d2Hand Lay OuterAbrasion CoverC/T 162 sI2.10 d3Steam Press MoldVulcanizeC/T 208 sI1.10 d4Carbon SteelSplit Flange FitC/T 147 sI0.90 d530-Bar Hydro &Burst AuditC/T 108 sI1.80 dCUSTOMERHVAC & PumpingStations280 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Mandrel Ply Build & Bead Wire135 s35 min94%98.4%420504 (1.80 d)360
2. Hand Lay Outer Abrasion Cover162 s30 min91%97.6%224448 (1.60 d)284
3. Steam Press Mold Vulcanize208 s40 min84%95.8%280588 (2.10 d)200
4. Carbon Steel Split Flange Fit147 s15 min93%98.0%112308 (1.10 d)321
5. 30-Bar Hydro & Burst Audit108 s8 min97%99.4%84252 (0.90 d)468

Key figures

Takt time
193 s
Lead time
9.31 d
Value-added time
760 s
Process cycle efficiency (PCE)
0.15%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
280 units
Line capacity per day
200 units
Bottleneck
Steam Press Mold Vulcanize

Reading the bottleneck

The bottleneck is "Steam Press Mold Vulcanize": it can process 200 units per day against a demand of 280 units, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 208 s to 258 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 84%), about 39.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.