Cryo-Deflashed FKM Aerospace O-Rings

Product family: High-Temp Fuel & Chemical Seals.

Flow: Fluoroelastomer Producer → Vacuum Compression Sheet Mold → Liquid-N2 Cryogenic Shot Tumbler → Post-Cure 230°C Oven Bake → Automated 360° Vision Sorter → AS5316 Clean Bag Lot Trace → Aero & Hydraulic Valve OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Cryo-Deflashed FKM Aerospace O-RingsSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Fluoroelastomer Producer → Vacuum Compression Sheet Mold (1.2 s) → Liquid-N2 Cryogenic Shot Tumbler (1.2 s) → Post-Cure 230°C Oven Bake (1.2 s) → Automated 360° Vision Sorter (1.2 s) → AS5316 Clean Bag Lot Trace (1.2 s) → Aero & Hydraulic Valve OEMs.SUPPLIERFluoroelastomerProducerI1.80 d1VacuumCompression Shee…C/T 1.2 sI1.60 d2Liquid-N2Cryogenic Shot…C/T 1.2 sI2.10 d3Post-Cure 230°COven BakeC/T 1.2 sI1.10 d4Automated 360°Vision SorterC/T 1.2 sI0.90 d5AS5316 Clean BagLot TraceC/T 1.2 sI1.80 dCUSTOMERAero &Hydraulic Valv…48,000 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Vacuum Compression Sheet Mold1.2 s35 min94%98.4%72,00086,400 (1.80 d)40,544
2. Liquid-N2 Cryogenic Shot Tumbler1.2 s30 min91%97.6%38,40076,800 (1.60 d)38,302
3. Post-Cure 230°C Oven Bake1.2 s40 min84%95.8%48,000100,800 (2.10 d)34,603
4. Automated 360° Vision Sorter1.2 s15 min93%98.0%19,20052,800 (1.10 d)39,304
5. AS5316 Clean Bag Lot Trace1.2 s8 min97%99.4%14,40043,200 (0.90 d)42,103

Key figures

Takt time
1.1 s
Lead time
9.30 d
Value-added time
6.0 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
48,000 parts
Line capacity per day
34,603 parts
Bottleneck
Post-Cure 230°C Oven Bake

Reading the bottleneck

The bottleneck is "Post-Cure 230°C Oven Bake": it can process 34,603 parts per day against a demand of 48,000 parts, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 1.2 s to 1.5 s, against a takt of 1.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Tires, Elastomers & Technical Rubber: Tires, Elastomers & Technical Rubber