Civil Engineering, Bridges, Tunnels & Rail VSM Scenarios

12 scenarios of Civil Engineering, Bridges, Tunnels & Rail, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Surveying & Earthwork Prep → Rebar Cage & Formwork Jig → Concrete Pour / TBM Ring Install → Cure, Post-Tension & Grind → NDT Core & Load Acceptance. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
Continuous GPS Asphalt Highway Paving Train240 tonnes per day2225 s8.52 d0.19%GPS 3D Millimeter Paver Lay
10m Slurry TBM Metro Tunnel Advance & Ring Cycle12 cases per day36,750 s8.83 d3.7%Erector Arm Gasketed Ring Set
Automated Continuous Welded High-Speed Rail Track180 batches per day2300 s8.52 d0.26%Flash-Butt Mobile Rail Weld
2000-Ton Reinforced Offshore-Onshore Wind Base4 cases per day16,750 s9.24 d10.7%28-Ton Rebar Cage & Ducts
Balanced Cantilever Cast-in-Situ Bridge Span6 cases per day29,000 s9.32 d7.0%Balanced Symmetric Concrete
Hydromill Concrete Diaphragm Station Wall8 cases per day26,750 s8.99 d5.5%Ultrasonic Verticality Check
6-Hour Nighttime Airport Runway Asphalt Rehab4 cases per day16,750 s9.24 d10.7%Echelon Twin-Paver Asphalt Lay
GPS Machine-Guided Highway Cut-and-Fill Haul320 batches per day2169 s8.51 d0.14%Articulated Dump Truck Cycle
Coastal Harbor Breakwater Interlocking Armor Placement24 parts per day11,125 s8.62 d1.9%Barge Crane Underwater Drop
Automated GPS Solar Tracker Steel Post Driving420 parts per day164.3 s8.51 d0.11%Hydraulic Post Ramming
1600mm Ductile Iron Potable Water Mainline Lay65 parts per day1415 s8.57 d0.71%Thrust Block & Valve Chamber
Urban Street Embedded Acoustic Light-Rail Track45 parts per day1600 s8.60 d1.0%Aluminothermic Joint Welding