1600mm Ductile Iron Potable Water Mainline Lay

Product family: Trench-to-Backfill Linear Flow.

Flow: Ductile Iron Pipe Producers → Laser-Graded Trench & Bedding → Crane Lower & Push-Joint Lock → Thrust Block & Valve Chamber → 30-Bar Hydro & Chlorination → Compacted Sand & Surface Road → Regional Water Authorities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1600mm Ductile Iron Potable Water Mainline LaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ductile Iron Pipe Producers → Laser-Graded Trench & Bedding (282 s) → Crane Lower & Push-Joint Lock (349 s) → Thrust Block & Valve Chamber (449 s) → 30-Bar Hydro & Chlorination (324 s) → Compacted Sand & Surface Road (233 s) → Regional Water Authorities.SUPPLIERDuctile IronPipe ProducersI1.51 d1Laser-GradedTrench & BeddingC/T 282 sI1.80 d2Crane Lower &Push-Joint LockC/T 349 sI2.20 d3Thrust Block &Valve ChamberC/T 449 sI1.60 d430-Bar Hydro &ChlorinationC/T 324 sI0.80 d5Compacted Sand &Surface RoadC/T 233 sI0.60 dCUSTOMERRegional WaterAuthorities65 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser-Graded Trench & Bedding282 s25 min94%97.6%5298 (1.51 d)82
2. Crane Lower & Push-Joint Lock349 s30 min91%96.5%39117 (1.80 d)60
3. Thrust Block & Valve Chamber449 s40 min84%94.8%33143 (2.20 d)40
4. 30-Bar Hydro & Chlorination324 s20 min93%98.0%33104 (1.60 d)69
5. Compacted Sand & Surface Road233 s10 min97%99.1%2052 (0.80 d)103

Key figures

Takt time
415 s
Lead time
8.57 d
Value-added time
1,637 s
Process cycle efficiency (PCE)
0.71%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
65 parts
Line capacity per day
40 parts
Bottleneck
Thrust Block & Valve Chamber

Reading the bottleneck

The bottleneck is "Thrust Block & Valve Chamber": it can process 40 parts per day against a demand of 65 parts, so it falls short of demand by 39.2%. Once downtime and scrap are counted, its cycle time grows from 449 s to 564 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 84%), about 85.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.