2000-Ton Reinforced Offshore-Onshore Wind Base

Product family: High-Cycle Post-Tension Pads.

Flow: Concrete Fleet & Rebar Yard → 20m Bedrock Excavation & Clean → Anchor Bolt Ring Laser Level → 28-Ton Rebar Cage & Ducts → Non-Stop Continuous 600m³ Pour → 28-Day Cylinder Break Release → Utility Onshore Wind Farms

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 2000-Ton Reinforced Offshore-Onshore Wind BaseSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Concrete Fleet & Rebar Yard → 20m Bedrock Excavation & Clean (4,590 s) → Anchor Bolt Ring Laser Level (5,670 s) → 28-Ton Rebar Cage & Ducts (7,290 s) → Non-Stop Continuous 600m³ Pour (5,265 s) → 28-Day Cylinder Break Release (3,780 s) → Utility Onshore Wind Farms.SUPPLIERConcrete Fleet& Rebar YardI1.50 d120m BedrockExcavation &…C/T 4,590 sI1.75 d2Anchor Bolt RingLaser LevelC/T 5,670 sI2.25 d328-Ton Rebar Cage& DuctsC/T 7,290 sI1.50 d4Non-StopContinuous 600m³…C/T 5,265 sI0.75 d528-Day CylinderBreak ReleaseC/T 3,780 sI0.50 dCUSTOMERUtility OnshoreWind Farms4 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 20m Bedrock Excavation & Clean4,590 s25 min94%97.6%36 (1.50 d)5
2. Anchor Bolt Ring Laser Level5,670 s30 min91%96.5%27 (1.75 d)4
3. 28-Ton Rebar Cage & Ducts7,290 s40 min84%94.8%29 (2.25 d)2
4. Non-Stop Continuous 600m³ Pour5,265 s20 min93%98.0%26 (1.50 d)4
5. 28-Day Cylinder Break Release3,780 s10 min97%99.1%13 (0.75 d)7

Key figures

Takt time
6,750 s
Lead time
9.24 d
Value-added time
26,595 s
Process cycle efficiency (PCE)
10.7%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
4 cases
Line capacity per day
2 cases
Bottleneck
28-Ton Rebar Cage & Ducts

Reading the bottleneck

The bottleneck is "28-Ton Rebar Cage & Ducts": it can process 2 cases per day against a demand of 4 cases, so it falls short of demand by 39.4%. Once downtime and scrap are counted, its cycle time grows from 7,290 s to 9,155 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,389 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.