2000-Ton Reinforced Offshore-Onshore Wind Base
Product family: High-Cycle Post-Tension Pads.
Flow: Concrete Fleet & Rebar Yard → 20m Bedrock Excavation & Clean → Anchor Bolt Ring Laser Level → 28-Ton Rebar Cage & Ducts → Non-Stop Continuous 600m³ Pour → 28-Day Cylinder Break Release → Utility Onshore Wind Farms
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 20m Bedrock Excavation & Clean | 4,590 s | 25 min | 94% | 97.6% | 3 | 6 (1.50 d) | 5 |
| 2. Anchor Bolt Ring Laser Level | 5,670 s | 30 min | 91% | 96.5% | 2 | 7 (1.75 d) | 4 |
| 3. 28-Ton Rebar Cage & Ducts | 7,290 s | 40 min | 84% | 94.8% | 2 | 9 (2.25 d) | 2 |
| 4. Non-Stop Continuous 600m³ Pour | 5,265 s | 20 min | 93% | 98.0% | 2 | 6 (1.50 d) | 4 |
| 5. 28-Day Cylinder Break Release | 3,780 s | 10 min | 97% | 99.1% | 1 | 3 (0.75 d) | 7 |
Key figures
- Takt time
- 6,750 s
- Lead time
- 9.24 d
- Value-added time
- 26,595 s
- Process cycle efficiency (PCE)
- 10.7%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 4 cases
- Line capacity per day
- 2 cases
- Bottleneck
- 28-Ton Rebar Cage & Ducts
Reading the bottleneck
The bottleneck is "28-Ton Rebar Cage & Ducts": it can process 2 cases per day against a demand of 4 cases, so it falls short of demand by 39.4%. Once downtime and scrap are counted, its cycle time grows from 7,290 s to 9,155 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,389 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Civil Engineering, Bridges, Tunnels & Rail: Civil Engineering, Bridges, Tunnels & Rail
- Continuous GPS Asphalt Highway Paving Train
- 10m Slurry TBM Metro Tunnel Advance & Ring Cycle
- Automated Continuous Welded High-Speed Rail Track
- Balanced Cantilever Cast-in-Situ Bridge Span
- Hydromill Concrete Diaphragm Station Wall
- 6-Hour Nighttime Airport Runway Asphalt Rehab
- GPS Machine-Guided Highway Cut-and-Fill Haul
- Coastal Harbor Breakwater Interlocking Armor Placement
- Automated GPS Solar Tracker Steel Post Driving
- 1600mm Ductile Iron Potable Water Mainline Lay
- Urban Street Embedded Acoustic Light-Rail Track