Urban Street Embedded Acoustic Light-Rail Track
Product family: Vibration-Isolated City Tram.
Flow: Polymer Track Embedding & Grooved Rail → Utility Diversion & Concrete Slab → Polymer Elastomer Channel Pour → Aluminothermic Joint Welding → Asphalt Wear Course & Paving → Bogie Clearance & Strayed Test → City Public Transit Agencies
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Utility Diversion & Concrete Slab | 408 s | 25 min | 94% | 97.6% | 36 | 68 (1.51 d) | 56 |
| 2. Polymer Elastomer Channel Pour | 504 s | 30 min | 91% | 96.5% | 27 | 81 (1.80 d) | 42 |
| 3. Aluminothermic Joint Welding | 648 s | 40 min | 84% | 94.8% | 23 | 99 (2.20 d) | 27 |
| 4. Asphalt Wear Course & Paving | 468 s | 20 min | 93% | 98.0% | 23 | 72 (1.60 d) | 48 |
| 5. Bogie Clearance & Strayed Test | 336 s | 10 min | 97% | 99.1% | 14 | 36 (0.80 d) | 72 |
Key figures
- Takt time
- 600 s
- Lead time
- 8.60 d
- Value-added time
- 2,364 s
- Process cycle efficiency (PCE)
- 1.0%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 45 parts
- Line capacity per day
- 27 parts
- Bottleneck
- Aluminothermic Joint Welding
Reading the bottleneck
The bottleneck is "Aluminothermic Joint Welding": it can process 27 parts per day against a demand of 45 parts, so it falls short of demand by 39.1%. Once downtime and scrap are counted, its cycle time grows from 648 s to 814 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 84%), about 123 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Civil Engineering, Bridges, Tunnels & Rail: Civil Engineering, Bridges, Tunnels & Rail
- Continuous GPS Asphalt Highway Paving Train
- 10m Slurry TBM Metro Tunnel Advance & Ring Cycle
- Automated Continuous Welded High-Speed Rail Track
- 2000-Ton Reinforced Offshore-Onshore Wind Base
- Balanced Cantilever Cast-in-Situ Bridge Span
- Hydromill Concrete Diaphragm Station Wall
- 6-Hour Nighttime Airport Runway Asphalt Rehab
- GPS Machine-Guided Highway Cut-and-Fill Haul
- Coastal Harbor Breakwater Interlocking Armor Placement
- Automated GPS Solar Tracker Steel Post Driving
- 1600mm Ductile Iron Potable Water Mainline Lay