Hydromill Concrete Diaphragm Station Wall

Product family: 40m Deep Basement Cut-Off.

Flow: Bentonite Plant & Rebar → Concrete Guide-Wall Trenching → Slurry Wall Panel Cut → Ultrasonic Verticality Check → Crawler Crane Stop-End & Cage → Double-Tremie Concrete Pour → Deep Metro Stations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hydromill Concrete Diaphragm Station WallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Bentonite Plant & Rebar → Concrete Guide-Wall Trenching (4,590 s) → Slurry Wall Panel Cut (5,670 s) → Ultrasonic Verticality Check (7,290 s) → Crawler Crane Stop-End & Cage (5,265 s) → Double-Tremie Concrete Pour (3,780 s) → Deep Metro Stations.SUPPLIERBentonite Plant& RebarI1.50 d1ConcreteGuide-Wall…C/T 4,590 sI1.75 d2Slurry Wall PanelCutC/T 5,670 sI2.25 d3UltrasonicVerticality CheckC/T 7,290 sI1.63 d4Crawler CraneStop-End & CageC/T 5,265 sI0.75 d5Double-TremieConcrete PourC/T 3,780 sI0.63 dCUSTOMERDeep MetroStations8 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Concrete Guide-Wall Trenching4,590 s25 min94%97.6%612 (1.50 d)10
2. Slurry Wall Panel Cut5,670 s30 min91%96.5%514 (1.75 d)8
3. Ultrasonic Verticality Check7,290 s40 min84%94.8%418 (2.25 d)5
4. Crawler Crane Stop-End & Cage5,265 s20 min93%98.0%413 (1.63 d)9
5. Double-Tremie Concrete Pour3,780 s10 min97%99.1%26 (0.75 d)13

Key figures

Takt time
6,750 s
Lead time
8.99 d
Value-added time
26,595 s
Process cycle efficiency (PCE)
5.5%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
8 cases
Line capacity per day
5 cases
Bottleneck
Ultrasonic Verticality Check

Reading the bottleneck

The bottleneck is "Ultrasonic Verticality Check": it can process 5 cases per day against a demand of 8 cases, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 7,290 s to 9,155 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,389 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.