Automated GPS Solar Tracker Steel Post Driving

Product family: 500MW Utility Solar Civils.

Flow: Galvanized W6x9 I-Beams → RTK-GPS Autonomous Pile Mark → High-Freq Vibro / Rock Drill → Hydraulic Post Ramming → Pull-Out Load Sample Audit → Cap & Torque Tube Mount Prep → Utility Solar PV Parks

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated GPS Solar Tracker Steel Post DrivingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Galvanized W6x9 I-Beams → RTK-GPS Autonomous Pile Mark (44.0 s) → High-Freq Vibro / Rock Drill (54.0 s) → Hydraulic Post Ramming (69.0 s) → Pull-Out Load Sample Audit (50.0 s) → Cap & Torque Tube Mount Prep (36.0 s) → Utility Solar PV Parks.SUPPLIERGalvanized W6x9I-BeamsI1.50 d1RTK-GPSAutonomous Pile…C/T 44.0 sI1.80 d2High-Freq Vibro /Rock DrillC/T 54.0 sI2.20 d3Hydraulic PostRammingC/T 69.0 sI1.60 d4Pull-Out LoadSample AuditC/T 50.0 sI0.80 d5Cap & Torque TubeMount PrepC/T 36.0 sI0.60 dCUSTOMERUtility SolarPV Parks420 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RTK-GPS Autonomous Pile Mark44.0 s25 min94%97.6%336630 (1.50 d)524
2. High-Freq Vibro / Rock Drill54.0 s30 min91%96.5%252756 (1.80 d)390
3. Hydraulic Post Ramming69.0 s40 min84%94.8%210924 (2.20 d)256
4. Pull-Out Load Sample Audit50.0 s20 min93%98.0%210672 (1.60 d)448
5. Cap & Torque Tube Mount Prep36.0 s10 min97%99.1%126336 (0.80 d)668

Key figures

Takt time
64.3 s
Lead time
8.51 d
Value-added time
253 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
420 parts
Line capacity per day
256 parts
Bottleneck
Hydraulic Post Ramming

Reading the bottleneck

The bottleneck is "Hydraulic Post Ramming": it can process 256 parts per day against a demand of 420 parts, so it falls short of demand by 39.0%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 86.6 s, against a takt of 64.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 13.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.