Automated GPS Solar Tracker Steel Post Driving
Product family: 500MW Utility Solar Civils.
Flow: Galvanized W6x9 I-Beams → RTK-GPS Autonomous Pile Mark → High-Freq Vibro / Rock Drill → Hydraulic Post Ramming → Pull-Out Load Sample Audit → Cap & Torque Tube Mount Prep → Utility Solar PV Parks
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. RTK-GPS Autonomous Pile Mark | 44.0 s | 25 min | 94% | 97.6% | 336 | 630 (1.50 d) | 524 |
| 2. High-Freq Vibro / Rock Drill | 54.0 s | 30 min | 91% | 96.5% | 252 | 756 (1.80 d) | 390 |
| 3. Hydraulic Post Ramming | 69.0 s | 40 min | 84% | 94.8% | 210 | 924 (2.20 d) | 256 |
| 4. Pull-Out Load Sample Audit | 50.0 s | 20 min | 93% | 98.0% | 210 | 672 (1.60 d) | 448 |
| 5. Cap & Torque Tube Mount Prep | 36.0 s | 10 min | 97% | 99.1% | 126 | 336 (0.80 d) | 668 |
Key figures
- Takt time
- 64.3 s
- Lead time
- 8.51 d
- Value-added time
- 253 s
- Process cycle efficiency (PCE)
- 0.11%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 420 parts
- Line capacity per day
- 256 parts
- Bottleneck
- Hydraulic Post Ramming
Reading the bottleneck
The bottleneck is "Hydraulic Post Ramming": it can process 256 parts per day against a demand of 420 parts, so it falls short of demand by 39.0%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 86.6 s, against a takt of 64.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 13.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Civil Engineering, Bridges, Tunnels & Rail: Civil Engineering, Bridges, Tunnels & Rail
- Continuous GPS Asphalt Highway Paving Train
- 10m Slurry TBM Metro Tunnel Advance & Ring Cycle
- Automated Continuous Welded High-Speed Rail Track
- 2000-Ton Reinforced Offshore-Onshore Wind Base
- Balanced Cantilever Cast-in-Situ Bridge Span
- Hydromill Concrete Diaphragm Station Wall
- 6-Hour Nighttime Airport Runway Asphalt Rehab
- GPS Machine-Guided Highway Cut-and-Fill Haul
- Coastal Harbor Breakwater Interlocking Armor Placement
- 1600mm Ductile Iron Potable Water Mainline Lay
- Urban Street Embedded Acoustic Light-Rail Track