Balanced Cantilever Cast-in-Situ Bridge Span
Product family: Post-Tension Box Girders.
Flow: Travelers & Strand Jacks → Form-Traveler Advance & Pin → Box-Girder Rebar & Tendon Duct → Balanced Symmetric Concrete → Hydraulic Stressing & Grouting → Camber Elevation Laser Audit → River & Viaduct Crossings
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Form-Traveler Advance & Pin | 6,120 s | 25 min | 94% | 97.6% | 5 | 9 (1.50 d) | 8 |
| 2. Box-Girder Rebar & Tendon Duct | 7,560 s | 30 min | 91% | 96.5% | 4 | 11 (1.83 d) | 6 |
| 3. Balanced Symmetric Concrete | 9,720 s | 40 min | 84% | 94.8% | 3 | 13 (2.17 d) | 4 |
| 4. Hydraulic Stressing & Grouting | 7,020 s | 20 min | 93% | 98.0% | 3 | 10 (1.67 d) | 7 |
| 5. Camber Elevation Laser Audit | 5,040 s | 10 min | 97% | 99.1% | 2 | 5 (0.83 d) | 10 |
Key figures
- Takt time
- 9,000 s
- Lead time
- 9.32 d
- Value-added time
- 35,460 s
- Process cycle efficiency (PCE)
- 7.0%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 6 cases
- Line capacity per day
- 4 cases
- Bottleneck
- Balanced Symmetric Concrete
Reading the bottleneck
The bottleneck is "Balanced Symmetric Concrete": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 9,720 s to 12,206 s, against a takt of 9,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,851 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Civil Engineering, Bridges, Tunnels & Rail: Civil Engineering, Bridges, Tunnels & Rail
- Continuous GPS Asphalt Highway Paving Train
- 10m Slurry TBM Metro Tunnel Advance & Ring Cycle
- Automated Continuous Welded High-Speed Rail Track
- 2000-Ton Reinforced Offshore-Onshore Wind Base
- Hydromill Concrete Diaphragm Station Wall
- 6-Hour Nighttime Airport Runway Asphalt Rehab
- GPS Machine-Guided Highway Cut-and-Fill Haul
- Coastal Harbor Breakwater Interlocking Armor Placement
- Automated GPS Solar Tracker Steel Post Driving
- 1600mm Ductile Iron Potable Water Mainline Lay
- Urban Street Embedded Acoustic Light-Rail Track