10m Slurry TBM Metro Tunnel Advance & Ring Cycle

Product family: Segmental Concrete Metro Bore.

Flow: Precast Segment Yard → TBM Cutterhead Slurry Bore → Muck Slurry Treatment Loop → Erector Arm Gasketed Ring Set → Two-Part Annulus Grout Inject → Laser Guidance Advance Check → Metropolitan Transit Authority

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 10m Slurry TBM Metro Tunnel Advance & Ring CycleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Precast Segment Yard → TBM Cutterhead Slurry Bore (4,590 s) → Muck Slurry Treatment Loop (5,670 s) → Erector Arm Gasketed Ring Set (7,290 s) → Two-Part Annulus Grout Inject (5,265 s) → Laser Guidance Advance Check (3,780 s) → Metropolitan Transit Authority.SUPPLIERPrecast SegmentYardI1.50 d1TBM CutterheadSlurry BoreC/T 4,590 sI1.83 d2Muck SlurryTreatment LoopC/T 5,670 sI2.17 d3Erector ArmGasketed Ring SetC/T 7,290 sI1.58 d4Two-Part AnnulusGrout InjectC/T 5,265 sI0.83 d5Laser GuidanceAdvance CheckC/T 3,780 sI0.58 dCUSTOMERMetropolitanTransit…12 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. TBM Cutterhead Slurry Bore4,590 s25 min94%97.6%1018 (1.50 d)16
2. Muck Slurry Treatment Loop5,670 s30 min91%96.5%722 (1.83 d)12
3. Erector Arm Gasketed Ring Set7,290 s40 min84%94.8%626 (2.17 d)8
4. Two-Part Annulus Grout Inject5,265 s20 min93%98.0%619 (1.58 d)14
5. Laser Guidance Advance Check3,780 s10 min97%99.1%410 (0.83 d)20

Key figures

Takt time
6,750 s
Lead time
8.83 d
Value-added time
26,595 s
Process cycle efficiency (PCE)
3.7%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
12 cases
Line capacity per day
8 cases
Bottleneck
Erector Arm Gasketed Ring Set

Reading the bottleneck

The bottleneck is "Erector Arm Gasketed Ring Set": it can process 8 cases per day against a demand of 12 cases, so it falls short of demand by 30.6%. Once downtime and scrap are counted, its cycle time grows from 7,290 s to 9,155 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,389 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.