Automated Continuous Welded High-Speed Rail Track

Product family: Slab & Ballast Rail Laying.

Flow: Concrete Sleepers & 60E1 Rail → Laser Graded Sub-Ballast Prep → Track-Laying Machine Sleepers → Flash-Butt Mobile Rail Weld → Ballast Tamp & Align → Ultrasonic Rail Head Test → National High-Speed Rail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Continuous Welded High-Speed Rail TrackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Concrete Sleepers & 60E1 Rail → Laser Graded Sub-Ballast Prep (204 s) → Track-Laying Machine Sleepers (252 s) → Flash-Butt Mobile Rail Weld (324 s) → Ballast Tamp & Align (234 s) → Ultrasonic Rail Head Test (168 s) → National High-Speed Rail.SUPPLIERConcreteSleepers & 60E1RailI1.50 d1Laser GradedSub-Ballast PrepC/T 204 sI1.80 d2Track-LayingMachine SleepersC/T 252 sI2.20 d3Flash-Butt MobileRail WeldC/T 324 sI1.60 d4Ballast Tamp &AlignC/T 234 sI0.80 d5Ultrasonic RailHead TestC/T 168 sI0.60 dCUSTOMERNationalHigh-Speed Rail180 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Graded Sub-Ballast Prep204 s25 min94%97.6%144270 (1.50 d)234
2. Track-Laying Machine Sleepers252 s30 min91%96.5%108324 (1.80 d)178
3. Flash-Butt Mobile Rail Weld324 s40 min84%94.8%90396 (2.20 d)121
4. Ballast Tamp & Align234 s20 min93%98.0%90288 (1.60 d)201
5. Ultrasonic Rail Head Test168 s10 min97%99.1%54144 (0.80 d)298

Key figures

Takt time
300 s
Lead time
8.52 d
Value-added time
1,182 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
180 batches
Line capacity per day
121 batches
Bottleneck
Flash-Butt Mobile Rail Weld

Reading the bottleneck

The bottleneck is "Flash-Butt Mobile Rail Weld": it can process 121 batches per day against a demand of 180 batches, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 324 s to 407 s, against a takt of 300 s. The largest loss at this step is equipment downtime (uptime 84%), about 61.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.