GPS Machine-Guided Highway Cut-and-Fill Haul
Product family: Balanced Mass-Haul Earthworks.
Flow: Borrow Pit & Quarry Cuts → 3D Drone Cut/Fill Volume Map → GPS Dozer & Excavator Load → Articulated Dump Truck Cycle → Vibratory Padfoot Compaction → Plate Load Ev2 Bearing Cert → Motorway & Rail Subgrades
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 3D Drone Cut/Fill Volume Map | 115 s | 25 min | 94% | 97.6% | 256 | 480 (1.50 d) | 416 |
| 2. GPS Dozer & Excavator Load | 142 s | 30 min | 91% | 96.5% | 192 | 576 (1.80 d) | 315 |
| 3. Articulated Dump Truck Cycle | 182 s | 40 min | 84% | 94.8% | 160 | 704 (2.20 d) | 215 |
| 4. Vibratory Padfoot Compaction | 132 s | 20 min | 93% | 98.0% | 160 | 512 (1.60 d) | 356 |
| 5. Plate Load Ev2 Bearing Cert | 95.0 s | 10 min | 97% | 99.1% | 96 | 256 (0.80 d) | 526 |
Key figures
- Takt time
- 169 s
- Lead time
- 8.51 d
- Value-added time
- 666 s
- Process cycle efficiency (PCE)
- 0.14%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 320 batches
- Line capacity per day
- 215 batches
- Bottleneck
- Articulated Dump Truck Cycle
Reading the bottleneck
The bottleneck is "Articulated Dump Truck Cycle": it can process 215 batches per day against a demand of 320 batches, so it falls short of demand by 32.7%. Once downtime and scrap are counted, its cycle time grows from 182 s to 229 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 84%), about 34.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Civil Engineering, Bridges, Tunnels & Rail: Civil Engineering, Bridges, Tunnels & Rail
- Continuous GPS Asphalt Highway Paving Train
- 10m Slurry TBM Metro Tunnel Advance & Ring Cycle
- Automated Continuous Welded High-Speed Rail Track
- 2000-Ton Reinforced Offshore-Onshore Wind Base
- Balanced Cantilever Cast-in-Situ Bridge Span
- Hydromill Concrete Diaphragm Station Wall
- 6-Hour Nighttime Airport Runway Asphalt Rehab
- Coastal Harbor Breakwater Interlocking Armor Placement
- Automated GPS Solar Tracker Steel Post Driving
- 1600mm Ductile Iron Potable Water Mainline Lay
- Urban Street Embedded Acoustic Light-Rail Track