Shipbuilding, Rail Rolling Stock & Heavy VSM Scenarios

12 scenarios of Shipbuilding, Rail Rolling Stock & Heavy, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Primer Blast & Plasma Panel Cut → Micro-Panel Sub-Assembly → 3D Hull Block Weld & Outfitting → Abrasive Blast & Epoxy Coat Cell → Drydock Erection & Basin Test. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
LNG Carrier Double-Hull Steel Block Assembly3 assemblies per day218,000 s11.6 d11.3%Pipe Spool & Cable Pre-Outfit
Offshore Wind 4-Legged Steel Jacket Foundation2 assemblies per day227,000 s12.5 d15.8%PWHT Stress Relief & PAUT NDT
11-Meter XXL Offshore Wind Monopile Rolling Line2 units per day340,500 s12.5 d15.8%Ring-to-Ring Circumferential
Intermodal 90ft Articulated Rail Container Wagon14 units per day23,857 s10.5 d2.7%Shot-Blast & Dual-Coat Epoxy
75m Superyacht Custom Interior Outfitting Bay2 cases per day113,500 s12.5 d15.8%Modular Luxury Joinery Erect
ASME Sec-VIII Petrochemical Hydrocracker Reactor2 units per day227,000 s12.5 d15.8%100% Linear-Accel Radiograph
Container Vessel Drydock Hull Silane Coating Flow2 cases per day340,500 s12.5 d15.8%Spot Epoxy Primer Stripe
5-Blade 9-Meter Ni-Al-Bronze Ship Propeller3 parts per day218,000 s11.6 d11.3%Dye-Penetrant Tip & Fillet
Inland River Double-Hull Hopper Cargo Barge3 units per day19,000 s11.6 d11.3%Sectional Weld & Vacuum Test
500-Ton Canal Lock Mitre Gate Overhaul Yard2 units per day113,500 s12.5 d15.8%Thermal Zinc Metallize Spray
1,200-Ton Shipyard Goliath Bridge Crane Erection1 units per day127,000 s14.9 d26.4%Heavy Strand-Jack Hoist Lift
Cutter-Suction Harbor Dredger Cutterhead Rebuild6 assemblies per day14,500 s10.8 d6.1%Chromium Carbide Hardfacing