Shipbuilding, Rail Rolling Stock & Heavy VSM Scenarios
12 scenarios of Shipbuilding, Rail Rolling Stock & Heavy, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Primer Blast & Plasma Panel Cut → Micro-Panel Sub-Assembly → 3D Hull Block Weld & Outfitting → Abrasive Blast & Epoxy Coat Cell → Drydock Erection & Basin Test. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| LNG Carrier Double-Hull Steel Block Assembly | 3 assemblies per day | 2 | 18,000 s | 11.6 d | 11.3% | Pipe Spool & Cable Pre-Outfit |
| Offshore Wind 4-Legged Steel Jacket Foundation | 2 assemblies per day | 2 | 27,000 s | 12.5 d | 15.8% | PWHT Stress Relief & PAUT NDT |
| 11-Meter XXL Offshore Wind Monopile Rolling Line | 2 units per day | 3 | 40,500 s | 12.5 d | 15.8% | Ring-to-Ring Circumferential |
| Intermodal 90ft Articulated Rail Container Wagon | 14 units per day | 2 | 3,857 s | 10.5 d | 2.7% | Shot-Blast & Dual-Coat Epoxy |
| 75m Superyacht Custom Interior Outfitting Bay | 2 cases per day | 1 | 13,500 s | 12.5 d | 15.8% | Modular Luxury Joinery Erect |
| ASME Sec-VIII Petrochemical Hydrocracker Reactor | 2 units per day | 2 | 27,000 s | 12.5 d | 15.8% | 100% Linear-Accel Radiograph |
| Container Vessel Drydock Hull Silane Coating Flow | 2 cases per day | 3 | 40,500 s | 12.5 d | 15.8% | Spot Epoxy Primer Stripe |
| 5-Blade 9-Meter Ni-Al-Bronze Ship Propeller | 3 parts per day | 2 | 18,000 s | 11.6 d | 11.3% | Dye-Penetrant Tip & Fillet |
| Inland River Double-Hull Hopper Cargo Barge | 3 units per day | 1 | 9,000 s | 11.6 d | 11.3% | Sectional Weld & Vacuum Test |
| 500-Ton Canal Lock Mitre Gate Overhaul Yard | 2 units per day | 1 | 13,500 s | 12.5 d | 15.8% | Thermal Zinc Metallize Spray |
| 1,200-Ton Shipyard Goliath Bridge Crane Erection | 1 units per day | 1 | 27,000 s | 14.9 d | 26.4% | Heavy Strand-Jack Hoist Lift |
| Cutter-Suction Harbor Dredger Cutterhead Rebuild | 6 assemblies per day | 1 | 4,500 s | 10.8 d | 6.1% | Chromium Carbide Hardfacing |