Intermodal 90ft Articulated Rail Container Wagon

Product family: High-Speed Freight Bogie Line.

Flow: Y25 Bogies & Steel Profiles → Camber Jig Spine Frame Weld → UT Critical Fatigue Weld Audit → Shot-Blast & Dual-Coat Epoxy → Y25 Bogie & UIC Brake Pipe → Static Buff & Twistlock Cert → European Rail Lessors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Intermodal 90ft Articulated Rail Container WagonSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Y25 Bogies & Steel Profiles → Camber Jig Spine Frame Weld (2,546 s) → UT Critical Fatigue Weld Audit (3,086 s) → Shot-Blast & Dual-Coat Epoxy (4,166 s) → Y25 Bogie & UIC Brake Pipe (3,009 s) → Static Buff & Twistlock Cert (2,391 s) → European Rail Lessors.SUPPLIERY25 Bogies &Steel ProfilesI1.93 d1Camber Jig SpineFrame WeldC/T 2,546 sI1.79 d2UT CriticalFatigue Weld…C/T 3,086 sI2.57 d3Shot-Blast &Dual-Coat EpoxyC/T 4,166 sI1.43 d4Y25 Bogie & UICBrake PipeC/T 3,009 sI1.00 d5Static Buff &Twistlock CertC/T 2,391 sI1.50 dCUSTOMEREuropean RailLessors14 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Camber Jig Spine Frame Weld2,546 s30 min95%99.0%2127 (1.93 d)20
2. UT Critical Fatigue Weld Audit3,086 s35 min92%97.6%1425 (1.79 d)15
3. Shot-Blast & Dual-Coat Epoxy4,166 s45 min84%95.4%1436 (2.57 d)10
4. Y25 Bogie & UIC Brake Pipe3,009 s25 min92%97.8%1120 (1.43 d)16
5. Static Buff & Twistlock Cert2,391 s15 min95%98.9%714 (1.00 d)21

Key figures

Takt time
3,857 s
Lead time
10.5 d
Value-added time
15,198 s
Process cycle efficiency (PCE)
2.7%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
14 units
Line capacity per day
10 units
Bottleneck
Shot-Blast & Dual-Coat Epoxy

Reading the bottleneck

The bottleneck is "Shot-Blast & Dual-Coat Epoxy": it can process 10 units per day against a demand of 14 units, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 4,166 s to 5,199 s, against a takt of 3,857 s. The largest loss at this step is equipment downtime (uptime 84%), about 794 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.