Cutter-Suction Harbor Dredger Cutterhead Rebuild

Product family: Hardfaced Alloy Dredge Teeth.

Flow: Wear Adapters & Cobalt Alloy → Arc-Air Gouge Worn Adapters → Pre-Heat Weld New Teeth Arms → Chromium Carbide Hardfacing → 5-Axis Shaft Taper Bore Check → Dynamic Balance & Dock Dispatch → Dredging Marine Contractors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Cutter-Suction Harbor Dredger Cutterhead RebuildSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wear Adapters & Cobalt Alloy → Arc-Air Gouge Worn Adapters (2,970 s) → Pre-Heat Weld New Teeth Arms (3,600 s) → Chromium Carbide Hardfacing (4,860 s) → 5-Axis Shaft Taper Bore Check (3,510 s) → Dynamic Balance & Dock Dispatch (2,790 s) → Dredging Marine Contractors.SUPPLIERWear Adapters &Cobalt AlloyI1.83 d1Arc-Air GougeWorn AdaptersC/T 2,970 sI1.83 d2Pre-Heat Weld NewTeeth ArmsC/T 3,600 sI2.67 d3Chromium CarbideHardfacingC/T 4,860 sI1.33 d45-Axis ShaftTaper Bore CheckC/T 3,510 sI1.00 d5Dynamic Balance &Dock DispatchC/T 2,790 sI1.50 dCUSTOMERDredging MarineContractors6 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Arc-Air Gouge Worn Adapters2,970 s30 min95%99.0%911 (1.83 d)8
2. Pre-Heat Weld New Teeth Arms3,600 s35 min92%97.6%611 (1.83 d)6
3. Chromium Carbide Hardfacing4,860 s45 min84%95.4%616 (2.67 d)4
4. 5-Axis Shaft Taper Bore Check3,510 s25 min92%97.8%58 (1.33 d)6
5. Dynamic Balance & Dock Dispatch2,790 s15 min95%98.9%36 (1.00 d)8

Key figures

Takt time
4,500 s
Lead time
10.8 d
Value-added time
17,730 s
Process cycle efficiency (PCE)
6.1%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
6 assemblies
Line capacity per day
4 assemblies
Bottleneck
Chromium Carbide Hardfacing

Reading the bottleneck

The bottleneck is "Chromium Carbide Hardfacing": it can process 4 assemblies per day against a demand of 6 assemblies, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,065 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 926 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.