Container Vessel Drydock Hull Silane Coating Flow

Product family: 72-Hr Turnaround Hull Refresh.

Flow: Foul-Release Paint → Docking Block Set & Dewater → 2500-Bar Hydro-Blast Strip → Spot Epoxy Primer Stripe → Heated Airless Silicone Finish → Propeller Polish & Flood Dock → Ocean Container Fleets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Container Vessel Drydock Hull Silane Coating FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Foul-Release Paint → Docking Block Set & Dewater (26,730 s) → 2500-Bar Hydro-Blast Strip (32,400 s) → Spot Epoxy Primer Stripe (43,740 s) → Heated Airless Silicone Finish (31,590 s) → Propeller Polish & Flood Dock (25,110 s) → Ocean Container Fleets.SUPPLIERFoul-ReleasePaintI2.00 d1Docking Block Set& DewaterC/T 26,730 sI2.00 d22500-BarHydro-Blast StripC/T 32,400 sI2.50 d3Spot Epoxy PrimerStripeC/T 43,740 sI1.50 d4Heated AirlessSilicone FinishC/T 31,590 sI1.00 d5Propeller Polish& Flood DockC/T 25,110 sI1.50 dCUSTOMEROcean ContainerFleets2 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Docking Block Set & Dewater26,730 s30 min95%99.0%34 (2.00 d)3
2. 2500-Bar Hydro-Blast Strip32,400 s35 min92%97.6%24 (2.00 d)2
3. Spot Epoxy Primer Stripe43,740 s45 min84%95.4%25 (2.50 d)1
4. Heated Airless Silicone Finish31,590 s25 min92%97.8%23 (1.50 d)2
5. Propeller Polish & Flood Dock25,110 s15 min95%98.9%12 (1.00 d)3

Key figures

Takt time
40,500 s
Lead time
12.5 d
Value-added time
159,570 s
Process cycle efficiency (PCE)
15.8%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2 cases
Line capacity per day
1 cases
Bottleneck
Spot Epoxy Primer Stripe

Reading the bottleneck

The bottleneck is "Spot Epoxy Primer Stripe": it can process 1 cases per day against a demand of 2 cases, so it falls short of demand by 28.3%. Once downtime and scrap are counted, its cycle time grows from 43,740 s to 54,582 s, against a takt of 40,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 8,331 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Shipbuilding, Rail Rolling Stock & Heavy: Shipbuilding, Rail Rolling Stock & Heavy