75m Superyacht Custom Interior Outfitting Bay

Product family: Marine Sound-Damped Luxury Fit.

Flow: Lightweight Honeycomb Joinery → 3D Laser Scan Cabin Mesh → Floating Acoustic Subfloor → Modular Luxury Joinery Erect → Marble, Lighting & AV Hook → Harbor Acceptance & Sea Trial → Private Maritime Clients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 75m Superyacht Custom Interior Outfitting BaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Lightweight Honeycomb Joinery → 3D Laser Scan Cabin Mesh (8,910 s) → Floating Acoustic Subfloor (10,800 s) → Modular Luxury Joinery Erect (14,580 s) → Marble, Lighting & AV Hook (10,530 s) → Harbor Acceptance & Sea Trial (8,370 s) → Private Maritime Clients.SUPPLIERLightweightHoneycombJoineryI2.00 d13D Laser ScanCabin MeshC/T 8,910 sI2.00 d2Floating AcousticSubfloorC/T 10,800 sI2.50 d3Modular LuxuryJoinery ErectC/T 14,580 sI1.50 d4Marble, Lighting& AV HookC/T 10,530 sI1.00 d5Harbor Acceptance& Sea TrialC/T 8,370 sI1.50 dCUSTOMERPrivateMaritime…2 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 3D Laser Scan Cabin Mesh8,910 s30 min95%99.0%34 (2.00 d)3
2. Floating Acoustic Subfloor10,800 s35 min92%97.6%24 (2.00 d)2
3. Modular Luxury Joinery Erect14,580 s45 min84%95.4%25 (2.50 d)1
4. Marble, Lighting & AV Hook10,530 s25 min92%97.8%23 (1.50 d)2
5. Harbor Acceptance & Sea Trial8,370 s15 min95%98.9%12 (1.00 d)3

Key figures

Takt time
13,500 s
Lead time
12.5 d
Value-added time
53,190 s
Process cycle efficiency (PCE)
15.8%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2 cases
Line capacity per day
1 cases
Bottleneck
Modular Luxury Joinery Erect

Reading the bottleneck

The bottleneck is "Modular Luxury Joinery Erect": it can process 1 cases per day against a demand of 2 cases, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 14,580 s to 18,194 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 2,777 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Shipbuilding, Rail Rolling Stock & Heavy: Shipbuilding, Rail Rolling Stock & Heavy