500-Ton Canal Lock Mitre Gate Overhaul Yard

Product family: Hydraulic Water-Barrier Gates.

Flow: Duplex Wear Strips & Oak Timb → Gantry Lift & Lead-Paint Strip → Magnetic-Particle Fatigue Fix → Thermal Zinc Metallize Spray → UHMWPE Sill & Pintle Bush Fit → Barge Float & Submerged Align → Inland Waterway Authorities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 500-Ton Canal Lock Mitre Gate Overhaul YardSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Duplex Wear Strips & Oak Timb → Gantry Lift & Lead-Paint Strip (8,910 s) → Magnetic-Particle Fatigue Fix (10,800 s) → Thermal Zinc Metallize Spray (14,580 s) → UHMWPE Sill & Pintle Bush Fit (10,530 s) → Barge Float & Submerged Align (8,370 s) → Inland Waterway Authorities.SUPPLIERDuplex WearStrips & OakTimbI2.00 d1Gantry Lift &Lead-Paint StripC/T 8,910 sI2.00 d2Magnetic-ParticleFatigue FixC/T 10,800 sI2.50 d3Thermal ZincMetallize SprayC/T 14,580 sI1.50 d4UHMWPE Sill &Pintle Bush FitC/T 10,530 sI1.00 d5Barge Float &Submerged AlignC/T 8,370 sI1.50 dCUSTOMERInland WaterwayAuthorities2 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Gantry Lift & Lead-Paint Strip8,910 s30 min95%99.0%34 (2.00 d)3
2. Magnetic-Particle Fatigue Fix10,800 s35 min92%97.6%24 (2.00 d)2
3. Thermal Zinc Metallize Spray14,580 s45 min84%95.4%25 (2.50 d)1
4. UHMWPE Sill & Pintle Bush Fit10,530 s25 min92%97.8%23 (1.50 d)2
5. Barge Float & Submerged Align8,370 s15 min95%98.9%12 (1.00 d)3

Key figures

Takt time
13,500 s
Lead time
12.5 d
Value-added time
53,190 s
Process cycle efficiency (PCE)
15.8%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2 units
Line capacity per day
1 units
Bottleneck
Thermal Zinc Metallize Spray

Reading the bottleneck

The bottleneck is "Thermal Zinc Metallize Spray": it can process 1 units per day against a demand of 2 units, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 14,580 s to 18,194 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 2,777 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.