Inland River Double-Hull Hopper Cargo Barge

Product family: Automated Box-Barge Line.

Flow: Shot-Blasted Steel Coils → Batch Laser Nesting Bulkheads → Automated Fillet Weld Gantry → Sectional Weld & Vacuum Test → Hatch Covers & Winch Mount → Slipway Launch & Class Approval → Rhine & Mississippi Fleets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Inland River Double-Hull Hopper Cargo BargeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Shot-Blasted Steel Coils → Batch Laser Nesting Bulkheads (5,940 s) → Automated Fillet Weld Gantry (7,200 s) → Sectional Weld & Vacuum Test (9,720 s) → Hatch Covers & Winch Mount (7,020 s) → Slipway Launch & Class Approval (5,580 s) → Rhine & Mississippi Fleets.SUPPLIERShot-BlastedSteel CoilsI2.00 d1Batch LaserNesting BulkheadsC/T 5,940 sI1.67 d2Automated FilletWeld GantryC/T 7,200 sI2.67 d3Sectional Weld &Vacuum TestC/T 9,720 sI1.33 d4Hatch Covers &Winch MountC/T 7,020 sI1.00 d5Slipway Launch &Class ApprovalC/T 5,580 sI1.67 dCUSTOMERRhine &Mississippi…3 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Batch Laser Nesting Bulkheads5,940 s30 min95%99.0%56 (2.00 d)4
2. Automated Fillet Weld Gantry7,200 s35 min92%97.6%35 (1.67 d)3
3. Sectional Weld & Vacuum Test9,720 s45 min84%95.4%38 (2.67 d)2
4. Hatch Covers & Winch Mount7,020 s25 min92%97.8%24 (1.33 d)3
5. Slipway Launch & Class Approval5,580 s15 min95%98.9%23 (1.00 d)4

Key figures

Takt time
9,000 s
Lead time
11.6 d
Value-added time
35,460 s
Process cycle efficiency (PCE)
11.3%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
3 units
Line capacity per day
2 units
Bottleneck
Sectional Weld & Vacuum Test

Reading the bottleneck

The bottleneck is "Sectional Weld & Vacuum Test": it can process 2 units per day against a demand of 3 units, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 9,720 s to 12,129 s, against a takt of 9,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,851 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.