Offshore Wind 4-Legged Steel Jacket Foundation

Product family: 1200T North Sea Steel Structures.

Flow: S355G10+N Heavy Tubular → Heavy Roll & Sub-Arc Can Weld → Multi-Brace Cast Node Fit-Up → PWHT Stress Relief & PAUT NDT → Splash-Zone Metallizing Coat → Skid Load-Out onto Barge → North Sea Offshore Yards

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Offshore Wind 4-Legged Steel Jacket FoundationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. S355G10+N Heavy Tubular → Heavy Roll & Sub-Arc Can Weld (17,820 s) → Multi-Brace Cast Node Fit-Up (21,600 s) → PWHT Stress Relief & PAUT NDT (29,160 s) → Splash-Zone Metallizing Coat (21,060 s) → Skid Load-Out onto Barge (16,740 s) → North Sea Offshore Yards.SUPPLIERS355G10+N HeavyTubularI2.00 d1Heavy Roll &Sub-Arc Can WeldC/T 17,820 sI2.00 d2Multi-Brace CastNode Fit-UpC/T 21,600 sI2.50 d3PWHT StressRelief & PAUT NDTC/T 29,160 sI1.50 d4Splash-ZoneMetallizing CoatC/T 21,060 sI1.00 d5Skid Load-Outonto BargeC/T 16,740 sI1.50 dCUSTOMERNorth SeaOffshore Yards2 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Heavy Roll & Sub-Arc Can Weld17,820 s30 min95%99.0%34 (2.00 d)3
2. Multi-Brace Cast Node Fit-Up21,600 s35 min92%97.6%24 (2.00 d)2
3. PWHT Stress Relief & PAUT NDT29,160 s45 min84%95.4%25 (2.50 d)1
4. Splash-Zone Metallizing Coat21,060 s25 min92%97.8%23 (1.50 d)2
5. Skid Load-Out onto Barge16,740 s15 min95%98.9%12 (1.00 d)3

Key figures

Takt time
27,000 s
Lead time
12.5 d
Value-added time
106,380 s
Process cycle efficiency (PCE)
15.8%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2 assemblies
Line capacity per day
1 assemblies
Bottleneck
PWHT Stress Relief & PAUT NDT

Reading the bottleneck

The bottleneck is "PWHT Stress Relief & PAUT NDT": it can process 1 assemblies per day against a demand of 2 assemblies, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 29,160 s to 36,388 s, against a takt of 27,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 5,554 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.