Semiconductors & Wafer Fab VSM Scenarios
12 scenarios of Semiconductors & Wafer Fab, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Wafer Clean & Epi Oxidation → EUV / ArF Photolithography → Plasma Etch & Ion Implant → CMP Polish & Copper Metal → Wafer Probe ATE & Dicing. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 5nm/3nm FinFET 300mm Wafer Logic Fab Line | 1,200 batches per day | 3 | 67.5 s | 10.2 d | 0.033% | EUV Multi-Pattern Litho |
| 1200V Silicon Carbide (SiC) EV MOSFET Fab | 850 batches per day | 3 | 95.3 s | 10.2 d | 0.047% | Stepper Gate Litho Mask |
| GaN-on-SiC 5G RF Power Amplifier Foundry | 320 batches per day | 2 | 169 s | 10.2 d | 0.12% | Electron-Beam Gate Litho |
| 6-Axis Automotive IMU MEMS Sensor Wafer | 2,400 batches per day | 3 | 33.8 s | 10.2 d | 0.016% | Deep Reactive Ion Etch DRIE |
| OSAT Flip-Chip BGA & 2.5D Interposer Pack | 18,000 units per day | 3 | 4.5 s | 10.2 d | 0.002% | Stealth Laser Wafer Dicing |
| QFN / SOIC Copper-Wire Molded IC Assembly | 45,000 units per day | 3 | 1.8 s | 10.2 d | 0.001% | Epoxy Die Attach & Cure |
| Tri-Temp Burn-In & Automated IC Final Test | 32,000 units per day | 3 | 2.5 s | 10.2 d | 0.001% | 150°C Dynamic HTOL Burn-In |
| PVT Silicon Carbide Crystal Growth & Wire Saw | 90 batches per day | 3 | 900 s | 10.2 d | 0.44% | OD Grind & Flat Orientation |
| EUV Phase-Shift Photomask Blank & Write | 28 units per day | 2 | 1,929 s | 10.4 d | 1.4% | Chrome/MoSi Dry Etch |
| Mini-SMD 1.6x1.2mm Quartz Crystal Resonator | 60,000 units per day | 3 | 1.4 s | 10.2 d | 0.001% | Vacuum Gold Electrode Sputter |
| Sapphire-Wafer GaN Micro-LED Epi & Chip | 28,000 units per day | 3 | 2.9 s | 10.2 d | 0.001% | ITO Transparent Contact Etch |
| Dual-Sided Sintered SiC Half-Bridge Module | 850 modules per day | 2 | 63.5 s | 10.2 d | 0.047% | Heavy Al Ribbon Wire Bond |