GaN-on-SiC 5G RF Power Amplifier Foundry

Product family: MMIC Compound Semicon.

Flow: GaN Substrate Suppliers → Mesa Isolation Etch → Electron-Beam Gate Litho → Au T-Gate Lift-Off & Passiv → Wafer Thinning 100um & Via → On-Wafer RF Load-Pull Test → Telecom & Aerospace RF

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: GaN-on-SiC 5G RF Power Amplifier FoundrySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. GaN Substrate Suppliers → Mesa Isolation Etch (118 s) → Electron-Beam Gate Litho (182 s) → Au T-Gate Lift-Off & Passiv (142 s) → Wafer Thinning 100um & Via (132 s) → On-Wafer RF Load-Pull Test (108 s) → Telecom & Aerospace RF.SUPPLIERGaN SubstrateSuppliersI1.60 d1Mesa IsolationEtchC/T 118 sI2.60 d2Electron-BeamGate LithoC/T 182 sI1.90 d3Au T-GateLift-Off & PassivC/T 142 sI1.50 d4Wafer Thinning100um & ViaC/T 132 sI1.10 d5On-Wafer RFLoad-Pull TestC/T 108 sI1.50 dCUSTOMERTelecom &Aerospace RF320 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Mesa Isolation Etch118 s20 min96%99.1%320512 (1.60 d)426
2. Electron-Beam Gate Litho182 s35 min83%94.8%384832 (2.60 d)226
3. Au T-Gate Lift-Off & Passiv142 s25 min90%97.4%256608 (1.90 d)322
4. Wafer Thinning 100um & Via132 s20 min92%98.0%192480 (1.50 d)355
5. On-Wafer RF Load-Pull Test108 s15 min95%96.8%128352 (1.10 d)441

Key figures

Takt time
169 s
Lead time
10.2 d
Value-added time
682 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
320 batches
Line capacity per day
226 batches
Bottleneck
Electron-Beam Gate Litho

Reading the bottleneck

The bottleneck is "Electron-Beam Gate Litho": it can process 226 batches per day against a demand of 320 batches, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 182 s to 231 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 83%), about 37.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.