Sapphire-Wafer GaN Micro-LED Epi & Chip

Product family: High-Efficiency Mini/Micro LED.

Flow: Patterned Sapphire Suppliers → MOCVD Multi-Wafer Epi Grow → ITO Transparent Contact Etch → Dicing Street Laser Scribing → Chip Sorter Luminance Bin → Tape-and-Reel Auto Map → Automotive Matrix & Displays

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Sapphire-Wafer GaN Micro-LED Epi & ChipSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Patterned Sapphire Suppliers → MOCVD Multi-Wafer Epi Grow (2.0 s) → ITO Transparent Contact Etch (3.1 s) → Dicing Street Laser Scribing (2.4 s) → Chip Sorter Luminance Bin (2.3 s) → Tape-and-Reel Auto Map (1.9 s) → Automotive Matrix & Displays.SUPPLIERPatternedSapphireSuppliersI1.60 d1MOCVD Multi-WaferEpi GrowC/T 2.0 sI2.60 d2ITO TransparentContact EtchC/T 3.1 sI1.90 d3Dicing StreetLaser ScribingC/T 2.4 sI1.50 d4Chip SorterLuminance BinC/T 2.3 sI1.10 d5Tape-and-ReelAuto MapC/T 1.9 sI1.50 dCUSTOMERAutomotiveMatrix &…28,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. MOCVD Multi-Wafer Epi Grow2.0 s20 min96%99.1%28,00044,800 (1.60 d)37,959
2. ITO Transparent Contact Etch3.1 s35 min83%94.8%33,60072,800 (2.60 d)20,115
3. Dicing Street Laser Scribing2.4 s25 min90%97.4%22,40053,200 (1.90 d)28,900
4. Chip Sorter Luminance Bin2.3 s20 min92%98.0%16,80042,000 (1.50 d)30,968
5. Tape-and-Reel Auto Map1.9 s15 min95%96.8%11,20030,800 (1.10 d)38,115

Key figures

Takt time
2.9 s
Lead time
10.2 d
Value-added time
11.7 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
28,000 units
Line capacity per day
20,115 units
Bottleneck
ITO Transparent Contact Etch

Reading the bottleneck

The bottleneck is "ITO Transparent Contact Etch": it can process 20,115 units per day against a demand of 28,000 units, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 3.1 s to 3.9 s, against a takt of 2.9 s. The largest loss at this step is equipment downtime (uptime 83%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Semiconductors & Wafer Fab: Semiconductors & Wafer Fab