Tri-Temp Burn-In & Automated IC Final Test

Product family: Zero-DPPM Auto Grade Test.

Flow: Foundry OSAT Outputs → Socket Load & Gravity Feed → 150°C Dynamic HTOL Burn-In → Cold -40°C Param ATE Sweep → Laser Brand & Vision Lead → Vacuum Dry-Pack Tape & Reel → Automotive Safety Tier-1

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Tri-Temp Burn-In & Automated IC Final TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Foundry OSAT Outputs → Socket Load & Gravity Feed (1.8 s) → 150°C Dynamic HTOL Burn-In (2.7 s) → Cold -40°C Param ATE Sweep (2.1 s) → Laser Brand & Vision Lead (2.0 s) → Vacuum Dry-Pack Tape & Reel (1.6 s) → Automotive Safety Tier-1.SUPPLIERFoundry OSATOutputsI1.60 d1Socket Load &Gravity FeedC/T 1.8 sI2.60 d2150°C DynamicHTOL Burn-InC/T 2.7 sI1.90 d3Cold -40°C ParamATE SweepC/T 2.1 sI1.50 d4Laser Brand &Vision LeadC/T 2.0 sI1.10 d5Vacuum Dry-PackTape & ReelC/T 1.6 sI1.50 dCUSTOMERAutomotiveSafety Tier-132,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Socket Load & Gravity Feed1.8 s20 min96%99.1%32,00051,200 (1.60 d)42,177
2. 150°C Dynamic HTOL Burn-In2.7 s35 min83%94.8%38,40083,200 (2.60 d)23,095
3. Cold -40°C Param ATE Sweep2.1 s25 min90%97.4%25,60060,800 (1.90 d)33,029
4. Laser Brand & Vision Lead2.0 s20 min92%98.0%19,20048,000 (1.50 d)35,613
5. Vacuum Dry-Pack Tape & Reel1.6 s15 min95%96.8%12,80035,200 (1.10 d)45,262

Key figures

Takt time
2.5 s
Lead time
10.2 d
Value-added time
10.2 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
32,000 units
Line capacity per day
23,095 units
Bottleneck
150°C Dynamic HTOL Burn-In

Reading the bottleneck

The bottleneck is "150°C Dynamic HTOL Burn-In": it can process 23,095 units per day against a demand of 32,000 units, so it falls short of demand by 27.8%. Once downtime and scrap are counted, its cycle time grows from 2.7 s to 3.4 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 83%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.