QFN / SOIC Copper-Wire Molded IC Assembly

Product family: Automotive Analog Package ICs.

Flow: Leadframe Suppliers → Wafer Saw & Expander Mount → Epoxy Die Attach & Cure → High-Speed Cu Wire Bonder → Transfer Epoxy Overmold → Tin Matte Plate & Handler FT → Tier-1 Auto & Industrial

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: QFN / SOIC Copper-Wire Molded IC AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Leadframe Suppliers → Wafer Saw & Expander Mount (1.3 s) → Epoxy Die Attach & Cure (1.9 s) → High-Speed Cu Wire Bonder (1.5 s) → Transfer Epoxy Overmold (1.4 s) → Tin Matte Plate & Handler FT (1.2 s) → Tier-1 Auto & Industrial.SUPPLIERLeadframeSuppliersI1.60 d1Wafer Saw &Expander MountC/T 1.3 sI2.60 d2Epoxy Die Attach& CureC/T 1.9 sI1.90 d3High-Speed CuWire BonderC/T 1.5 sI1.50 d4Transfer EpoxyOvermoldC/T 1.4 sI1.10 d5Tin Matte Plate &Handler FTC/T 1.2 sI1.50 dCUSTOMERTier-1 Auto &Industrial45,000 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Wafer Saw & Expander Mount1.3 s20 min96%99.1%45,00072,000 (1.60 d)58,399
2. Epoxy Die Attach & Cure1.9 s35 min83%94.8%54,000117,000 (2.60 d)32,820
3. High-Speed Cu Wire Bonder1.5 s25 min90%97.4%36,00085,500 (1.90 d)46,241
4. Transfer Epoxy Overmold1.4 s20 min92%98.0%27,00067,500 (1.50 d)50,876
5. Tin Matte Plate & Handler FT1.2 s15 min95%96.8%18,00049,500 (1.10 d)60,349

Key figures

Takt time
1.8 s
Lead time
10.2 d
Value-added time
7.3 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
45,000 units
Line capacity per day
32,820 units
Bottleneck
Epoxy Die Attach & Cure

Reading the bottleneck

The bottleneck is "Epoxy Die Attach & Cure": it can process 32,820 units per day against a demand of 45,000 units, so it falls short of demand by 27.1%. Once downtime and scrap are counted, its cycle time grows from 1.9 s to 2.4 s, against a takt of 1.8 s. The largest loss at this step is equipment downtime (uptime 83%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.