PVT Silicon Carbide Crystal Growth & Wire Saw
Product family: Low-Micropipe 200mm SiC Boules.
Flow: High-Purity Si & Graphite → 2200°C PVT Seed Crystal Grow → OD Grind & Flat Orientation → Diamond Multi-Wire Wafer Saw → Lapping & Laser Edge Bevel → KOH Defect & Bow Inspection → SiC Wafer Epi Fabs
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 2200°C PVT Seed Crystal Grow | 630 s | 20 min | 96% | 99.1% | 90 | 144 (1.60 d) | 121 |
| 2. OD Grind & Flat Orientation | 972 s | 35 min | 83% | 94.8% | 108 | 234 (2.60 d) | 64 |
| 3. Diamond Multi-Wire Wafer Saw | 756 s | 25 min | 90% | 97.4% | 72 | 171 (1.90 d) | 92 |
| 4. Lapping & Laser Edge Bevel | 702 s | 20 min | 92% | 98.0% | 54 | 135 (1.50 d) | 101 |
| 5. KOH Defect & Bow Inspection | 576 s | 15 min | 95% | 96.8% | 36 | 99 (1.10 d) | 126 |
Key figures
- Takt time
- 900 s
- Lead time
- 10.2 d
- Value-added time
- 3,636 s
- Process cycle efficiency (PCE)
- 0.44%
- Rolled throughput yield (RTY)
- 86.8%
- Customer demand per day
- 90 batches
- Line capacity per day
- 64 batches
- Bottleneck
- OD Grind & Flat Orientation
Reading the bottleneck
The bottleneck is "OD Grind & Flat Orientation": it can process 64 batches per day against a demand of 90 batches, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 972 s to 1,235 s, against a takt of 900 s. The largest loss at this step is equipment downtime (uptime 83%), about 199 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Semiconductors & Wafer Fab: Semiconductors & Wafer Fab
- 5nm/3nm FinFET 300mm Wafer Logic Fab Line
- 1200V Silicon Carbide (SiC) EV MOSFET Fab
- GaN-on-SiC 5G RF Power Amplifier Foundry
- 6-Axis Automotive IMU MEMS Sensor Wafer
- OSAT Flip-Chip BGA & 2.5D Interposer Pack
- QFN / SOIC Copper-Wire Molded IC Assembly
- Tri-Temp Burn-In & Automated IC Final Test
- EUV Phase-Shift Photomask Blank & Write
- Mini-SMD 1.6x1.2mm Quartz Crystal Resonator
- Sapphire-Wafer GaN Micro-LED Epi & Chip
- Dual-Sided Sintered SiC Half-Bridge Module