Dual-Sided Sintered SiC Half-Bridge Module

Product family: 1200V 600A EV Power Bricks.

Flow: DBC Ceramic Substrate Suppliers → Silver Sintering Die Press → Heavy Al Ribbon Wire Bond → AMB Top-Cool Copper Mate → Transfer Compression Epoxy → Surge Vcesat & X-Ray Void → Inverter Final Assembly

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dual-Sided Sintered SiC Half-Bridge ModuleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. DBC Ceramic Substrate Suppliers → Silver Sintering Die Press (44.0 s) → Heavy Al Ribbon Wire Bond (69.0 s) → AMB Top-Cool Copper Mate (53.0 s) → Transfer Compression Epoxy (50.0 s) → Surge Vcesat & X-Ray Void (41.0 s) → Inverter Final Assembly.SUPPLIERDBC CeramicSubstrateSuppliersI1.60 d1Silver SinteringDie PressC/T 44.0 sI2.60 d2Heavy Al RibbonWire BondC/T 69.0 sI1.90 d3AMB Top-CoolCopper MateC/T 53.0 sI1.50 d4TransferCompression EpoxyC/T 50.0 sI1.10 d5Surge Vcesat &X-Ray VoidC/T 41.0 sI1.50 dCUSTOMERInverter FinalAssembly850 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Silver Sintering Die Press44.0 s20 min96%99.1%8501,360 (1.60 d)1,142
2. Heavy Al Ribbon Wire Bond69.0 s35 min83%94.8%1,0202,210 (2.60 d)596
3. AMB Top-Cool Copper Mate53.0 s25 min90%97.4%6801,615 (1.90 d)862
4. Transfer Compression Epoxy50.0 s20 min92%98.0%5101,275 (1.50 d)938
5. Surge Vcesat & X-Ray Void41.0 s15 min95%96.8%340935 (1.10 d)1,161

Key figures

Takt time
63.5 s
Lead time
10.2 d
Value-added time
257 s
Process cycle efficiency (PCE)
0.047%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
850 modules
Line capacity per day
596 modules
Bottleneck
Heavy Al Ribbon Wire Bond

Reading the bottleneck

The bottleneck is "Heavy Al Ribbon Wire Bond": it can process 596 modules per day against a demand of 850 modules, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 87.7 s, against a takt of 63.5 s. The largest loss at this step is equipment downtime (uptime 83%), about 14.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Semiconductors & Wafer Fab: Semiconductors & Wafer Fab