EUV Phase-Shift Photomask Blank & Write

Product family: 193nm & EUV Reticles.

Flow: Photomask Blank Suppliers → 50keV Electron-Beam Write → Chrome/MoSi Dry Etch → Pellicle Frame Clean Mount → Actinic DUV Die-to-DB Inspect → FIB Focused-Ion Repair & Cert → Global Foundry Litho Bays

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EUV Phase-Shift Photomask Blank & WriteSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Photomask Blank Suppliers → 50keV Electron-Beam Write (1,350 s) → Chrome/MoSi Dry Etch (2,083 s) → Pellicle Frame Clean Mount (1,620 s) → Actinic DUV Die-to-DB Inspect (1,504 s) → FIB Focused-Ion Repair & Cert (1,234 s) → Global Foundry Litho Bays.SUPPLIERPhotomask BlankSuppliersI1.61 d150keVElectron-Beam…C/T 1,350 sI2.61 d2Chrome/MoSi DryEtchC/T 2,083 sI1.89 d3Pellicle FrameClean MountC/T 1,620 sI1.50 d4Actinic DUVDie-to-DB InspectC/T 1,504 sI1.11 d5FIB Focused-IonRepair & CertC/T 1,234 sI1.50 dCUSTOMERGlobal FoundryLitho Bays28 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 50keV Electron-Beam Write1,350 s20 min96%99.1%2845 (1.61 d)37
2. Chrome/MoSi Dry Etch2,083 s35 min83%94.8%3473 (2.61 d)20
3. Pellicle Frame Clean Mount1,620 s25 min90%97.4%2253 (1.89 d)28
4. Actinic DUV Die-to-DB Inspect1,504 s20 min92%98.0%1742 (1.50 d)31
5. FIB Focused-Ion Repair & Cert1,234 s15 min95%96.8%1131 (1.11 d)39

Key figures

Takt time
1,929 s
Lead time
10.4 d
Value-added time
7,791 s
Process cycle efficiency (PCE)
1.4%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
28 units
Line capacity per day
20 units
Bottleneck
Chrome/MoSi Dry Etch

Reading the bottleneck

The bottleneck is "Chrome/MoSi Dry Etch": it can process 20 units per day against a demand of 28 units, so it falls short of demand by 29.5%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,647 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 83%), about 427 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.