1200V Silicon Carbide (SiC) EV MOSFET Fab

Product family: 150mm/200mm SiC Power Dies.

Flow: SiC Boule Suppliers → SiC High-Temp Epi Clean → Stepper Gate Litho Mask → 1700°C Al/N Ion Implant → Nickel Silicide Ohmic Anneal → 1500V Avalanche Wafer Probe → EV Traction Inverter Makers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1200V Silicon Carbide (SiC) EV MOSFET FabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. SiC Boule Suppliers → SiC High-Temp Epi Clean (67.0 s) → Stepper Gate Litho Mask (103 s) → 1700°C Al/N Ion Implant (80.0 s) → Nickel Silicide Ohmic Anneal (74.0 s) → 1500V Avalanche Wafer Probe (61.0 s) → EV Traction Inverter Makers.SUPPLIERSiC BouleSuppliersI1.60 d1SiC High-Temp EpiCleanC/T 67.0 sI2.60 d2Stepper GateLitho MaskC/T 103 sI1.90 d31700°C Al/N IonImplantC/T 80.0 sI1.50 d4Nickel SilicideOhmic AnnealC/T 74.0 sI1.10 d51500V AvalancheWafer ProbeC/T 61.0 sI1.50 dCUSTOMEREV TractionInverter Makers850 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. SiC High-Temp Epi Clean67.0 s20 min96%99.1%8501,360 (1.60 d)1,133
2. Stepper Gate Litho Mask103 s35 min83%94.8%1,0202,210 (2.60 d)605
3. 1700°C Al/N Ion Implant80.0 s25 min90%97.4%6801,615 (1.90 d)867
4. Nickel Silicide Ohmic Anneal74.0 s20 min92%98.0%5101,275 (1.50 d)963
5. 1500V Avalanche Wafer Probe61.0 s15 min95%96.8%340935 (1.10 d)1,187

Key figures

Takt time
95.3 s
Lead time
10.2 d
Value-added time
385 s
Process cycle efficiency (PCE)
0.047%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
850 batches
Line capacity per day
605 batches
Bottleneck
Stepper Gate Litho Mask

Reading the bottleneck

The bottleneck is "Stepper Gate Litho Mask": it can process 605 batches per day against a demand of 850 batches, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 103 s to 131 s, against a takt of 95.3 s. The largest loss at this step is equipment downtime (uptime 83%), about 21.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.