5nm/3nm FinFET 300mm Wafer Logic Fab Line

Product family: 12-Inch CMOS Logic Wafers.

Flow: Silicon Wafer Supplier → Epi Clean & Gate Stack → EUV Multi-Pattern Litho → RIE Plasma & Fin Etch → Cu Damascene & CMP → Electrical Probe & Sort → Fabless Cloud Hyperscalers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5nm/3nm FinFET 300mm Wafer Logic Fab LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Silicon Wafer Supplier → Epi Clean & Gate Stack (47.0 s) → EUV Multi-Pattern Litho (73.0 s) → RIE Plasma & Fin Etch (57.0 s) → Cu Damascene & CMP (53.0 s) → Electrical Probe & Sort (43.0 s) → Fabless Cloud Hyperscalers.SUPPLIERSilicon WaferSupplierI1.60 d1Epi Clean & GateStackC/T 47.0 sI2.60 d2EUV Multi-PatternLithoC/T 73.0 sI1.90 d3RIE Plasma & FinEtchC/T 57.0 sI1.50 d4Cu Damascene &CMPC/T 53.0 sI1.10 d5Electrical Probe& SortC/T 43.0 sI1.50 dCUSTOMERFabless CloudHyperscalers1,200 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Epi Clean & Gate Stack47.0 s20 min96%99.1%1,2001,920 (1.60 d)1,615
2. EUV Multi-Pattern Litho73.0 s35 min83%94.8%1,4403,120 (2.60 d)854
3. RIE Plasma & Fin Etch57.0 s25 min90%97.4%9602,280 (1.90 d)1,217
4. Cu Damascene & CMP53.0 s20 min92%98.0%7201,800 (1.50 d)1,344
5. Electrical Probe & Sort43.0 s15 min95%96.8%4801,320 (1.10 d)1,684

Key figures

Takt time
67.5 s
Lead time
10.2 d
Value-added time
273 s
Process cycle efficiency (PCE)
0.033%
Rolled throughput yield (RTY)
86.8%
Customer demand per day
1,200 batches
Line capacity per day
854 batches
Bottleneck
EUV Multi-Pattern Litho

Reading the bottleneck

The bottleneck is "EUV Multi-Pattern Litho": it can process 854 batches per day against a demand of 1,200 batches, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 73.0 s to 92.8 s, against a takt of 67.5 s. The largest loss at this step is equipment downtime (uptime 83%), about 15.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.