6-Axis Automotive IMU MEMS Sensor Wafer
Product family: Micromachined Accelerometers.
Flow: SOI Silicon Wafers → Thermal Oxide & Cap Wafer → Deep Reactive Ion Etch DRIE → Vacuum Wafer-Level Cap Bond → CMOS ASIC Flip-Chip Stack → Tri-Temp Shake Table Test → Automotive Airbag & Drones
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Thermal Oxide & Cap Wafer | 23.6 s | 20 min | 96% | 99.1% | 2,400 | 3,840 (1.60 d) | 3,217 |
| 2. Deep Reactive Ion Etch DRIE | 36.5 s | 35 min | 83% | 94.8% | 2,880 | 6,240 (2.60 d) | 1,708 |
| 3. Vacuum Wafer-Level Cap Bond | 28.3 s | 25 min | 90% | 97.4% | 1,920 | 4,560 (1.90 d) | 2,451 |
| 4. CMOS ASIC Flip-Chip Stack | 26.3 s | 20 min | 92% | 98.0% | 1,440 | 3,600 (1.50 d) | 2,708 |
| 5. Tri-Temp Shake Table Test | 21.6 s | 15 min | 95% | 96.8% | 960 | 2,640 (1.10 d) | 3,353 |
Key figures
- Takt time
- 33.8 s
- Lead time
- 10.2 d
- Value-added time
- 136 s
- Process cycle efficiency (PCE)
- 0.016%
- Rolled throughput yield (RTY)
- 86.8%
- Customer demand per day
- 2,400 batches
- Line capacity per day
- 1,708 batches
- Bottleneck
- Deep Reactive Ion Etch DRIE
Reading the bottleneck
The bottleneck is "Deep Reactive Ion Etch DRIE": it can process 1,708 batches per day against a demand of 2,400 batches, so it falls short of demand by 28.8%. Once downtime and scrap are counted, its cycle time grows from 36.5 s to 46.4 s, against a takt of 33.8 s. The largest loss at this step is equipment downtime (uptime 83%), about 7.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Semiconductors & Wafer Fab: Semiconductors & Wafer Fab
- 5nm/3nm FinFET 300mm Wafer Logic Fab Line
- 1200V Silicon Carbide (SiC) EV MOSFET Fab
- GaN-on-SiC 5G RF Power Amplifier Foundry
- OSAT Flip-Chip BGA & 2.5D Interposer Pack
- QFN / SOIC Copper-Wire Molded IC Assembly
- Tri-Temp Burn-In & Automated IC Final Test
- PVT Silicon Carbide Crystal Growth & Wire Saw
- EUV Phase-Shift Photomask Blank & Write
- Mini-SMD 1.6x1.2mm Quartz Crystal Resonator
- Sapphire-Wafer GaN Micro-LED Epi & Chip
- Dual-Sided Sintered SiC Half-Bridge Module