Decarbonization, Green Steel & Circular ESG VSM Scenarios
12 scenarios of Decarbonization, Green Steel & Circular ESG, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Feedstock / CO2 Capture Intake → Green Hydrogen / Heat Reaction → Regeneration / EAF Melt Refine → Gas / Metal Purity Telemetry QC → Verified Carbon / Low-CO2 Lot Out. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Direct Air Capture (DAC) Solid-Sorbent CO2 Pod | 18 batches per day | 3 | 4,500 s | 8.05 d | 2.7% | 100°C Steam Thermal Desorb |
| Continuous Biomass Pyrolysis Biochar Carbon Sink | 38 tonnes per day | 3 | 2,132 s | 7.92 d | 1.3% | Syngas Flare / CHP Steam Loop |
| 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF | 650 tonnes per day | 3 | 125 s | 7.81 d | 0.076% | Argon Ladle Secondary Refine |
| Cement Flue-Gas Post-Combustion Amine CCUS | 140 tonnes per day | 3 | 579 s | 7.83 d | 0.35% | 120°C Stripper Reboiler Desorb |
| Closed-Loop Beverage Can-to-Can Al Remelt Line | 220 tonnes per day | 3 | 368 s | 7.82 d | 0.22% | Argon-Cl2 Rotary Flux Degas |
| Used Cooking Oil (UCO) to Sustainable Aviation Fuel | 160 batches per day | 3 | 506 s | 7.82 d | 0.31% | Selective Isomerization Crack |
| Black-Mass Lithium, Cobalt & Nickel Hydromet | 42 tonnes per day | 3 | 1,929 s | 7.88 d | 1.2% | Ion Exchange Purity Polish |
| Captured CO2 + Green H2 e-Methanol Synthesis | 110 tonnes per day | 3 | 736 s | 7.84 d | 0.45% | Water Separation Flash Drum |
| Automated Product Carbon Footprint (PCF) ISO-14067 | 48 files per day | 1 | 563 s | 7.89 d | 1.0% | Transport Distance & Energy Map |
| Industrial Waste-Heat Upgrade 150°C Steam Pump | 6 skids per day | 1 | 4,500 s | 8.31 d | 7.7% | Flash Tank Steam Separator |
| End-of-Life Solar PV Glass, Silver & Si Recovery | 48 tonnes per day | 2 | 1,125 s | 7.89 d | 1.0% | Mechanical Glass Separation |
| EU CBAM & EUDR Deforestation Supply-Chain Gate | 95 files per day | 1 | 284 s | 7.85 d | 0.52% | Embedded Emission Formula QC |