Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
Product family: Modular Atmospheric Capture.
Flow: Geothermal Heat & Ambient Air → High-Flow Fan CO2 Adsorption → Chamber Vacuum Seal Closure → 100°C Steam Thermal Desorb → CO2 Condense & Water Purge → 150-Bar Supercritical Pipe → Subsurface Basalt Sequestration
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. High-Flow Fan CO2 Adsorption | 3,060 s | 20 min | 94% | 98.2% | 18 | 25 (1.39 d) | 24 |
| 2. Chamber Vacuum Seal Closure | 3,780 s | 30 min | 91% | 97.4% | 18 | 29 (1.61 d) | 19 |
| 3. 100°C Steam Thermal Desorb | 4,815 s | 40 min | 84% | 95.8% | 18 | 36 (2.00 d) | 13 |
| 4. CO2 Condense & Water Purge | 3,240 s | 10 min | 96% | 98.6% | 7 | 16 (0.89 d) | 23 |
| 5. 150-Bar Supercritical Pipe | 2,430 s | 8 min | 97% | 99.4% | 5 | 13 (0.72 d) | 31 |
Key figures
- Takt time
- 4,500 s
- Lead time
- 8.05 d
- Value-added time
- 17,325 s
- Process cycle efficiency (PCE)
- 2.7%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 18 batches
- Line capacity per day
- 13 batches
- Bottleneck
- 100°C Steam Thermal Desorb
Reading the bottleneck
The bottleneck is "100°C Steam Thermal Desorb": it can process 13 batches per day against a demand of 18 batches, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 5,983 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 917 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Decarbonization, Green Steel & Circular ESG: Decarbonization, Green Steel & Circular ESG
- Continuous Biomass Pyrolysis Biochar Carbon Sink
- 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
- Cement Flue-Gas Post-Combustion Amine CCUS
- Closed-Loop Beverage Can-to-Can Al Remelt Line
- Used Cooking Oil (UCO) to Sustainable Aviation Fuel
- Black-Mass Lithium, Cobalt & Nickel Hydromet
- Captured CO2 + Green H2 e-Methanol Synthesis
- Automated Product Carbon Footprint (PCF) ISO-14067
- Industrial Waste-Heat Upgrade 150°C Steam Pump
- End-of-Life Solar PV Glass, Silver & Si Recovery
- EU CBAM & EUDR Deforestation Supply-Chain Gate