Captured CO2 + Green H2 e-Methanol Synthesis
Product family: Carbon-Neutral Marine Fuel.
Flow: Biogenic CO2 & Green H2 → 3:1 H2/CO2 Compression Feed → Cu/ZnO Catalytic Loop Reactor → Water Separation Flash Drum → 2-Column Distillation Polish → Methanol Purity Grade & Bunkering → Green Container Shipping
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 3:1 H2/CO2 Compression Feed | 501 s | 20 min | 94% | 98.2% | 110 | 154 (1.40 d) | 147 |
| 2. Cu/ZnO Catalytic Loop Reactor | 619 s | 30 min | 91% | 97.4% | 110 | 176 (1.60 d) | 113 |
| 3. Water Separation Flash Drum | 788 s | 40 min | 84% | 95.8% | 110 | 220 (2.00 d) | 80 |
| 4. 2-Column Distillation Polish | 530 s | 10 min | 96% | 98.6% | 44 | 99 (0.90 d) | 142 |
| 5. Methanol Purity Grade & Bunkering | 398 s | 8 min | 97% | 99.4% | 33 | 77 (0.70 d) | 192 |
Key figures
- Takt time
- 736 s
- Lead time
- 7.84 d
- Value-added time
- 2,836 s
- Process cycle efficiency (PCE)
- 0.45%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 110 tonnes
- Line capacity per day
- 80 tonnes
- Bottleneck
- Water Separation Flash Drum
Reading the bottleneck
The bottleneck is "Water Separation Flash Drum": it can process 80 tonnes per day against a demand of 110 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 788 s to 979 s, against a takt of 736 s. The largest loss at this step is equipment downtime (uptime 84%), about 150 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Decarbonization, Green Steel & Circular ESG: Decarbonization, Green Steel & Circular ESG
- Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
- Continuous Biomass Pyrolysis Biochar Carbon Sink
- 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
- Cement Flue-Gas Post-Combustion Amine CCUS
- Closed-Loop Beverage Can-to-Can Al Remelt Line
- Used Cooking Oil (UCO) to Sustainable Aviation Fuel
- Black-Mass Lithium, Cobalt & Nickel Hydromet
- Automated Product Carbon Footprint (PCF) ISO-14067
- Industrial Waste-Heat Upgrade 150°C Steam Pump
- End-of-Life Solar PV Glass, Silver & Si Recovery
- EU CBAM & EUDR Deforestation Supply-Chain Gate