Continuous Biomass Pyrolysis Biochar Carbon Sink

Product family: EBC-Certified Biochar Credits.

Flow: Forestry Slash & Nut Shells → Waste-Heat Chip Pre-Dryer → 650°C Oxygen-Free Rotary Pyro → Syngas Flare / CHP Steam Loop → Water Quench & Dust Bagging → H/Corg Ratio Lab & Certification → Carbon Credit & Soil Farmers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Continuous Biomass Pyrolysis Biochar Carbon SinkSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Forestry Slash & Nut Shells → Waste-Heat Chip Pre-Dryer (1,449 s) → 650°C Oxygen-Free Rotary Pyro (1,791 s) → Syngas Flare / CHP Steam Loop (2,281 s) → Water Quench & Dust Bagging (1,535 s) → H/Corg Ratio Lab & Certification (1,151 s) → Carbon Credit & Soil Farmers.SUPPLIERForestry Slash& Nut ShellsI1.39 d1Waste-Heat ChipPre-DryerC/T 1,449 sI1.61 d2650°C Oxygen-FreeRotary PyroC/T 1,791 sI2.00 d3Syngas Flare /CHP Steam LoopC/T 2,281 sI0.89 d4Water Quench &Dust BaggingC/T 1,535 sI0.71 d5H/Corg Ratio Lab& CertificationC/T 1,151 sI1.21 dCUSTOMERCarbon Credit &Soil Farmers38 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Waste-Heat Chip Pre-Dryer1,449 s20 min94%98.2%3853 (1.39 d)51
2. 650°C Oxygen-Free Rotary Pyro1,791 s30 min91%97.4%3861 (1.61 d)39
3. Syngas Flare / CHP Steam Loop2,281 s40 min84%95.8%3876 (2.00 d)28
4. Water Quench & Dust Bagging1,535 s10 min96%98.6%1534 (0.89 d)49
5. H/Corg Ratio Lab & Certification1,151 s8 min97%99.4%1127 (0.71 d)66

Key figures

Takt time
2,132 s
Lead time
7.92 d
Value-added time
8,207 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
38 tonnes
Line capacity per day
28 tonnes
Bottleneck
Syngas Flare / CHP Steam Loop

Reading the bottleneck

The bottleneck is "Syngas Flare / CHP Steam Loop": it can process 28 tonnes per day against a demand of 38 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 2,281 s to 2,835 s, against a takt of 2,132 s. The largest loss at this step is equipment downtime (uptime 84%), about 434 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.