Closed-Loop Beverage Can-to-Can Al Remelt Line
Product family: Zero-Primary UBC Ingot Cast.
Flow: Shredded UBC Used Cans → Delacquering Rotary Decoater → Sidewell Induction Vortex Melt → Argon-Cl2 Rotary Flux Degas → Ceramic Foam 30ppi Filter → 28-Ton DC Slab Ingot Cast → Can Body Sheet Rolling Mills
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Delacquering Rotary Decoater | 250 s | 20 min | 94% | 98.2% | 220 | 308 (1.40 d) | 295 |
| 2. Sidewell Induction Vortex Melt | 309 s | 30 min | 91% | 97.4% | 220 | 352 (1.60 d) | 227 |
| 3. Argon-Cl2 Rotary Flux Degas | 394 s | 40 min | 84% | 95.8% | 220 | 440 (2.00 d) | 161 |
| 4. Ceramic Foam 30ppi Filter | 265 s | 10 min | 96% | 98.6% | 88 | 198 (0.90 d) | 284 |
| 5. 28-Ton DC Slab Ingot Cast | 199 s | 8 min | 97% | 99.4% | 66 | 154 (0.70 d) | 385 |
Key figures
- Takt time
- 368 s
- Lead time
- 7.82 d
- Value-added time
- 1,417 s
- Process cycle efficiency (PCE)
- 0.22%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 220 tonnes
- Line capacity per day
- 161 tonnes
- Bottleneck
- Argon-Cl2 Rotary Flux Degas
Reading the bottleneck
The bottleneck is "Argon-Cl2 Rotary Flux Degas": it can process 161 tonnes per day against a demand of 220 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 394 s to 490 s, against a takt of 368 s. The largest loss at this step is equipment downtime (uptime 84%), about 75.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Decarbonization, Green Steel & Circular ESG: Decarbonization, Green Steel & Circular ESG
- Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
- Continuous Biomass Pyrolysis Biochar Carbon Sink
- 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
- Cement Flue-Gas Post-Combustion Amine CCUS
- Used Cooking Oil (UCO) to Sustainable Aviation Fuel
- Black-Mass Lithium, Cobalt & Nickel Hydromet
- Captured CO2 + Green H2 e-Methanol Synthesis
- Automated Product Carbon Footprint (PCF) ISO-14067
- Industrial Waste-Heat Upgrade 150°C Steam Pump
- End-of-Life Solar PV Glass, Silver & Si Recovery
- EU CBAM & EUDR Deforestation Supply-Chain Gate