Automated Product Carbon Footprint (PCF) ISO-14067
Product family: Cradle-to-Gate SKU Passport.
Flow: ERP BOM & Utility Meters → BOM Mass & Scrap Ingestion → Primary Supplier EPD Match → Transport Distance & Energy Map → ISO-14067 Uncertainty Audit → Digital Product Passport PDF → OEM Auto & Retail Buyers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. BOM Mass & Scrap Ingestion | 383 s | 20 min | 94% | 98.2% | 48 | 67 (1.40 d) | 62 |
| 2. Primary Supplier EPD Match | 473 s | 30 min | 91% | 97.4% | 48 | 77 (1.60 d) | 47 |
| 3. Transport Distance & Energy Map | 602 s | 40 min | 84% | 95.8% | 48 | 96 (2.00 d) | 33 |
| 4. ISO-14067 Uncertainty Audit | 405 s | 10 min | 96% | 98.6% | 19 | 43 (0.90 d) | 60 |
| 5. Digital Product Passport PDF | 304 s | 8 min | 97% | 99.4% | 14 | 34 (0.71 d) | 80 |
Key figures
- Takt time
- 563 s
- Lead time
- 7.89 d
- Value-added time
- 2,167 s
- Process cycle efficiency (PCE)
- 1.0%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 48 files
- Line capacity per day
- 33 files
- Bottleneck
- Transport Distance & Energy Map
Reading the bottleneck
The bottleneck is "Transport Distance & Energy Map": it can process 33 files per day against a demand of 48 files, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 602 s to 748 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 84%), about 115 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Decarbonization, Green Steel & Circular ESG: Decarbonization, Green Steel & Circular ESG
- Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
- Continuous Biomass Pyrolysis Biochar Carbon Sink
- 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
- Cement Flue-Gas Post-Combustion Amine CCUS
- Closed-Loop Beverage Can-to-Can Al Remelt Line
- Used Cooking Oil (UCO) to Sustainable Aviation Fuel
- Black-Mass Lithium, Cobalt & Nickel Hydromet
- Captured CO2 + Green H2 e-Methanol Synthesis
- Industrial Waste-Heat Upgrade 150°C Steam Pump
- End-of-Life Solar PV Glass, Silver & Si Recovery
- EU CBAM & EUDR Deforestation Supply-Chain Gate