Cement Flue-Gas Post-Combustion Amine CCUS

Product family: 95% CO2 Capture Plant Skid.

Flow: Cement Preheater Exhaust Gas → SOx/NOx Polishing Quench → Counter-Current Absorber Pack → 120°C Stripper Reboiler Desorb → Moisture Trap & TEG Dehydrate → Liquefaction -25°C Tanker Ship → E-Fuels & Deep Saline Storage

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Cement Flue-Gas Post-Combustion Amine CCUSSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cement Preheater Exhaust Gas → SOx/NOx Polishing Quench (393 s) → Counter-Current Absorber Pack (486 s) → 120°C Stripper Reboiler Desorb (619 s) → Moisture Trap & TEG Dehydrate (417 s) → Liquefaction -25°C Tanker Ship (312 s) → E-Fuels & Deep Saline Storage.SUPPLIERCementPreheaterExhaust GasI1.40 d1SOx/NOx PolishingQuenchC/T 393 sI1.60 d2Counter-CurrentAbsorber PackC/T 486 sI2.00 d3120°C StripperReboiler DesorbC/T 619 sI0.90 d4Moisture Trap &TEG DehydrateC/T 417 sI0.70 d5Liquefaction-25°C Tanker ShipC/T 312 sI1.20 dCUSTOMERE-Fuels & DeepSaline Storage140 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. SOx/NOx Polishing Quench393 s20 min94%98.2%140196 (1.40 d)187
2. Counter-Current Absorber Pack486 s30 min91%97.4%140224 (1.60 d)144
3. 120°C Stripper Reboiler Desorb619 s40 min84%95.8%140280 (2.00 d)102
4. Moisture Trap & TEG Dehydrate417 s10 min96%98.6%56126 (0.90 d)180
5. Liquefaction -25°C Tanker Ship312 s8 min97%99.4%4298 (0.70 d)245

Key figures

Takt time
579 s
Lead time
7.83 d
Value-added time
2,227 s
Process cycle efficiency (PCE)
0.35%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
140 tonnes
Line capacity per day
102 tonnes
Bottleneck
120°C Stripper Reboiler Desorb

Reading the bottleneck

The bottleneck is "120°C Stripper Reboiler Desorb": it can process 102 tonnes per day against a demand of 140 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 619 s to 769 s, against a takt of 579 s. The largest loss at this step is equipment downtime (uptime 84%), about 118 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.