Black-Mass Lithium, Cobalt & Nickel Hydromet

Product family: Closed-Loop Cathode Salts.

Flow: EV Shredding Black Mass → Acid Leaching & Fe/Cu Remove → Solvent Extraction Co/Ni Sep → Ion Exchange Purity Polish → Evaporative Sulfate Crystal → Battery-Grade Salt Big-Bag → EV Precursor Cathode Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Black-Mass Lithium, Cobalt & Nickel HydrometSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. EV Shredding Black Mass → Acid Leaching & Fe/Cu Remove (1,311 s) → Solvent Extraction Co/Ni Sep (1,620 s) → Ion Exchange Purity Polish (2,064 s) → Evaporative Sulfate Crystal (1,389 s) → Battery-Grade Salt Big-Bag (1,041 s) → EV Precursor Cathode Plants.SUPPLIEREV ShreddingBlack MassI1.40 d1Acid Leaching &Fe/Cu RemoveC/T 1,311 sI1.60 d2SolventExtraction Co/Ni…C/T 1,620 sI2.00 d3Ion ExchangePurity PolishC/T 2,064 sI0.90 d4EvaporativeSulfate CrystalC/T 1,389 sI0.69 d5Battery-GradeSalt Big-BagC/T 1,041 sI1.19 dCUSTOMEREV PrecursorCathode Plants42 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Acid Leaching & Fe/Cu Remove1,311 s20 min94%98.2%4259 (1.40 d)56
2. Solvent Extraction Co/Ni Sep1,620 s30 min91%97.4%4267 (1.60 d)43
3. Ion Exchange Purity Polish2,064 s40 min84%95.8%4284 (2.00 d)31
4. Evaporative Sulfate Crystal1,389 s10 min96%98.6%1738 (0.90 d)54
5. Battery-Grade Salt Big-Bag1,041 s8 min97%99.4%1329 (0.69 d)74

Key figures

Takt time
1,929 s
Lead time
7.88 d
Value-added time
7,425 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
89.8%
Customer demand per day
42 tonnes
Line capacity per day
31 tonnes
Bottleneck
Ion Exchange Purity Polish

Reading the bottleneck

The bottleneck is "Ion Exchange Purity Polish": it can process 31 tonnes per day against a demand of 42 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 2,064 s to 2,565 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 393 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.