EU CBAM & EUDR Deforestation Supply-Chain Gate
Product family: Automated Border Compliance.
Flow: Global Tier-1 Importer Docs → Supplier Polygon/CO2 Upload → Satellite Deforestation Overlap → Embedded Emission Formula QC → Missing Data Supplier Follow → Quarterly CBAM XML Registry → EU Customs & Trade Desk
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Supplier Polygon/CO2 Upload | 193 s | 20 min | 94% | 98.2% | 95 | 133 (1.40 d) | 123 |
| 2. Satellite Deforestation Overlap | 239 s | 30 min | 91% | 97.4% | 95 | 152 (1.60 d) | 93 |
| 3. Embedded Emission Formula QC | 304 s | 40 min | 84% | 95.8% | 95 | 190 (2.00 d) | 65 |
| 4. Missing Data Supplier Follow | 205 s | 10 min | 96% | 98.6% | 38 | 86 (0.91 d) | 118 |
| 5. Quarterly CBAM XML Registry | 153 s | 8 min | 97% | 99.4% | 29 | 67 (0.71 d) | 160 |
Key figures
- Takt time
- 284 s
- Lead time
- 7.85 d
- Value-added time
- 1,094 s
- Process cycle efficiency (PCE)
- 0.52%
- Rolled throughput yield (RTY)
- 89.8%
- Customer demand per day
- 95 files
- Line capacity per day
- 65 files
- Bottleneck
- Embedded Emission Formula QC
Reading the bottleneck
The bottleneck is "Embedded Emission Formula QC": it can process 65 files per day against a demand of 95 files, so it falls short of demand by 31.5%. Once downtime and scrap are counted, its cycle time grows from 304 s to 378 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 84%), about 57.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Decarbonization, Green Steel & Circular ESG: Decarbonization, Green Steel & Circular ESG
- Direct Air Capture (DAC) Solid-Sorbent CO2 Pod
- Continuous Biomass Pyrolysis Biochar Carbon Sink
- 100% Hydrogen Direct-Reduced Iron (H2-DRI) EAF
- Cement Flue-Gas Post-Combustion Amine CCUS
- Closed-Loop Beverage Can-to-Can Al Remelt Line
- Used Cooking Oil (UCO) to Sustainable Aviation Fuel
- Black-Mass Lithium, Cobalt & Nickel Hydromet
- Captured CO2 + Green H2 e-Methanol Synthesis
- Automated Product Carbon Footprint (PCF) ISO-14067
- Industrial Waste-Heat Upgrade 150°C Steam Pump
- End-of-Life Solar PV Glass, Silver & Si Recovery