Power Grids, Substations & Smart Metering VSM Scenarios
12 scenarios of Power Grids, Substations & Smart Metering, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Permit Outage & Protection Study → Civil Pad & Steel Gantry Prep → HV Transformer / Joint Execution → IEC-61850 Relay Inject & HiPot → SCADA Closing & Grid Restoration. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| 220kV Air-Insulated Grid Substation Bay Build | 4 cases per day | 1 | 6,750 s | 8.45 d | 11.2% | SF6-Free Circuit Breaker Tie |
| Mass AMI Smart Electricity Meter Swap Route | 650 units per day | 1 | 41.5 s | 7.41 d | 0.079% | DIN Rail Swap & Torque Cover |
| 63kV Overhead Aluminum HTLS Reconductoring | 12 cases per day | 1 | 2,250 s | 7.73 d | 4.1% | Tensioner Dead-End Compress |
| 110kV XLPE Underground Cable Splice & HiPot | 8 cases per day | 1 | 3,375 s | 7.85 d | 6.0% | Hydraulic Shear-Bolt Weld |
| Storm Distribution Feeder Fault Isolation & Restore | 45 cases per day | 3 | 1,800 s | 7.51 d | 1.1% | Crew Patrol & Tree Clear Cut |
| PWR Nuclear Power Plant Refueling Outage (RFO) | 2 cases per day | 3 | 40,500 s | 9.39 d | 20.1% | Steam Generator Eddy-Current |
| 450MW Gas Turbine Hot-Gas-Path Inspection | 2 cases per day | 2 | 27,000 s | 9.39 d | 20.1% | Combustor Transition Swap |
| Electric Bus Depot 3MW Grid Transformer Upgrade | 6 cases per day | 1 | 4,500 s | 7.96 d | 7.9% | 150kW Overhead Gantry Wire |
| 2GW Offshore HVDC Converter Thyristor Maintenance | 4 cases per day | 1 | 6,750 s | 8.45 d | 11.2% | Laser Fiber Firing Calibration |
| Municipal Streetlight Zhaga-D4i Smart LED Retro | 320 units per day | 1 | 84.4 s | 7.41 d | 0.16% | D4i LED Head & Tilt Bolt |
| Substation IEC-61850 Protection Relay Maintenance | 28 units per day | 1 | 964 s | 7.53 d | 1.8% | GOOSE Fiber Latency Measure |
| Industrial Islandable Solar+Genset Microgrid | 6 cases per day | 1 | 4,500 s | 7.96 d | 7.9% | Edge Grid-Forming Droop Tune |