110kV XLPE Underground Cable Splice & HiPot

Product family: Clean-Tent Vault Jointing.

Flow: Cold-Shrink Joint Kit OEMs → Vault Pump-Out & Climate Tent → Laser Semi-Con Strip & Chamfer → Hydraulic Shear-Bolt Weld → Slip-On Stress Cone Cold-Shrink → 2U0 AC Resonant HiPot Test → Urban Power Corridors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 110kV XLPE Underground Cable Splice & HiPotSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cold-Shrink Joint Kit OEMs → Vault Pump-Out & Climate Tent (2,228 s) → Laser Semi-Con Strip & Chamfer (2,633 s) → Hydraulic Shear-Bolt Weld (3,645 s) → Slip-On Stress Cone Cold-Shrink (2,565 s) → 2U0 AC Resonant HiPot Test (1,688 s) → Urban Power Corridors.SUPPLIERCold-ShrinkJoint Kit OEMsI1.75 d1Vault Pump-Out &Climate TentC/T 2,228 sI1.63 d2Laser Semi-ConStrip & ChamferC/T 2,633 sI2.25 d3HydraulicShear-Bolt WeldC/T 3,645 sI0.88 d4Slip-On StressCone Cold-ShrinkC/T 2,565 sI0.38 d52U0 AC ResonantHiPot TestC/T 1,688 sI0.50 dCUSTOMERUrban PowerCorridors8 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Vault Pump-Out & Climate Tent2,228 s15 min96%95.8%214 (1.75 d)10
2. Laser Semi-Con Strip & Chamfer2,633 s20 min93%97.6%313 (1.63 d)8
3. Hydraulic Shear-Bolt Weld3,645 s30 min85%94.5%218 (2.25 d)4
4. Slip-On Stress Cone Cold-Shrink2,565 s12 min94%97.8%27 (0.88 d)9
5. 2U0 AC Resonant HiPot Test1,688 s5 min98%99.4%13 (0.38 d)15

Key figures

Takt time
3,375 s
Lead time
7.85 d
Value-added time
12,759 s
Process cycle efficiency (PCE)
6.0%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
8 cases
Line capacity per day
4 cases
Bottleneck
Hydraulic Shear-Bolt Weld

Reading the bottleneck

The bottleneck is "Hydraulic Shear-Bolt Weld": it can process 4 cases per day against a demand of 8 cases, so it falls short of demand by 45.5%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,538 s, against a takt of 3,375 s. The largest loss at this step is changeovers (30 min every 2 units), about 900 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.