Storm Distribution Feeder Fault Isolation & Restore

Product family: SAIDI <45-Min Auto-Restore.

Flow: ADMS Fault Locator Alerts → ADMS Smart-Meter Outage Ping → FLISR Remote Section Isolate → Crew Patrol & Tree Clear Cut → Live-Line Hotstick Fuse Swap → Backfeed Confirm & Telemetry → Affected Grid Households

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Storm Distribution Feeder Fault Isolation & RestoreSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. ADMS Fault Locator Alerts → ADMS Smart-Meter Outage Ping (1,188 s) → FLISR Remote Section Isolate (1,404 s) → Crew Patrol & Tree Clear Cut (1,944 s) → Live-Line Hotstick Fuse Swap (1,368 s) → Backfeed Confirm & Telemetry (900 s) → Affected Grid Households.SUPPLIERADMS FaultLocator AlertsI1.80 d1ADMS Smart-MeterOutage PingC/T 1,188 sI1.60 d2FLISR RemoteSection IsolateC/T 1,404 sI2.20 d3Crew Patrol &Tree Clear CutC/T 1,944 sI0.91 d4Live-LineHotstick Fuse…C/T 1,368 sI0.40 d5Backfeed Confirm& TelemetryC/T 900 sI0.51 dCUSTOMERAffected GridHouseholds45 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. ADMS Smart-Meter Outage Ping1,188 s15 min96%95.8%1481 (1.80 d)60
2. FLISR Remote Section Isolate1,404 s20 min93%97.6%1872 (1.60 d)50
3. Crew Patrol & Tree Clear Cut1,944 s30 min85%94.5%1499 (2.20 d)31
4. Live-Line Hotstick Fuse Swap1,368 s12 min94%97.8%941 (0.91 d)52
5. Backfeed Confirm & Telemetry900 s5 min98%99.4%518 (0.40 d)85

Key figures

Takt time
1,800 s
Lead time
7.51 d
Value-added time
6,804 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
45 cases
Line capacity per day
31 cases
Bottleneck
Crew Patrol & Tree Clear Cut

Reading the bottleneck

The bottleneck is "Crew Patrol & Tree Clear Cut": it can process 31 cases per day against a demand of 45 cases, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 1,944 s to 2,420 s, against a takt of 1,800 s. The largest loss at this step is equipment downtime (uptime 85%), about 343 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering