Industrial Islandable Solar+Genset Microgrid
Product family: Seamless Black-Start Control.
Flow: Microgrid PLC & Relays → PCC Static Transfer Install → Diesel Genset Governor Tie → Edge Grid-Forming Droop Tune → Unplanned Island Load-Shed → Seamless Re-Sync Utility Grid → Remote Mine & Campus Sites
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. PCC Static Transfer Install | 2,970 s | 15 min | 96% | 95.8% | 2 | 11 (1.83 d) | 8 |
| 2. Diesel Genset Governor Tie | 3,510 s | 20 min | 93% | 97.6% | 2 | 10 (1.67 d) | 6 |
| 3. Edge Grid-Forming Droop Tune | 4,860 s | 30 min | 85% | 94.5% | 2 | 13 (2.17 d) | 4 |
| 4. Unplanned Island Load-Shed | 3,420 s | 12 min | 94% | 97.8% | 1 | 5 (0.83 d) | 7 |
| 5. Seamless Re-Sync Utility Grid | 2,250 s | 5 min | 98% | 99.4% | 1 | 2 (0.33 d) | 12 |
Key figures
- Takt time
- 4,500 s
- Lead time
- 7.96 d
- Value-added time
- 17,010 s
- Process cycle efficiency (PCE)
- 7.9%
- Rolled throughput yield (RTY)
- 85.9%
- Customer demand per day
- 6 cases
- Line capacity per day
- 4 cases
- Bottleneck
- Edge Grid-Forming Droop Tune
Reading the bottleneck
The bottleneck is "Edge Grid-Forming Droop Tune": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 40.5%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,050 s, against a takt of 4,500 s. The largest loss at this step is changeovers (30 min every 2 units), about 900 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Power Grids, Substations & Smart Metering: Power Grids, Substations & Smart Metering
- 220kV Air-Insulated Grid Substation Bay Build
- Mass AMI Smart Electricity Meter Swap Route
- 63kV Overhead Aluminum HTLS Reconductoring
- 110kV XLPE Underground Cable Splice & HiPot
- Storm Distribution Feeder Fault Isolation & Restore
- PWR Nuclear Power Plant Refueling Outage (RFO)
- 450MW Gas Turbine Hot-Gas-Path Inspection
- Electric Bus Depot 3MW Grid Transformer Upgrade
- 2GW Offshore HVDC Converter Thyristor Maintenance
- Municipal Streetlight Zhaga-D4i Smart LED Retro
- Substation IEC-61850 Protection Relay Maintenance