Electric Bus Depot 3MW Grid Transformer Upgrade

Product family: Overnight Fleet Depot Power.

Flow: Pad-Mount 3MVA Transformers → Utility Load Study & Trench → Cast Transformer Craning Tie → 150kW Overhead Gantry Wire → OCPP Smart Peak Load Cap → 10-Bus Simultaneous Test → City Public Transit Operators

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Electric Bus Depot 3MW Grid Transformer UpgradeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pad-Mount 3MVA Transformers → Utility Load Study & Trench (2,970 s) → Cast Transformer Craning Tie (3,510 s) → 150kW Overhead Gantry Wire (4,860 s) → OCPP Smart Peak Load Cap (3,420 s) → 10-Bus Simultaneous Test (2,250 s) → City Public Transit Operators.SUPPLIERPad-Mount 3MVATransformersI1.83 d1Utility LoadStudy & TrenchC/T 2,970 sI1.67 d2Cast TransformerCraning TieC/T 3,510 sI2.17 d3150kW OverheadGantry WireC/T 4,860 sI0.83 d4OCPP Smart PeakLoad CapC/T 3,420 sI0.33 d510-BusSimultaneous TestC/T 2,250 sI0.50 dCUSTOMERCity PublicTransit…6 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Utility Load Study & Trench2,970 s15 min96%95.8%211 (1.83 d)8
2. Cast Transformer Craning Tie3,510 s20 min93%97.6%210 (1.67 d)6
3. 150kW Overhead Gantry Wire4,860 s30 min85%94.5%213 (2.17 d)4
4. OCPP Smart Peak Load Cap3,420 s12 min94%97.8%15 (0.83 d)7
5. 10-Bus Simultaneous Test2,250 s5 min98%99.4%12 (0.33 d)12

Key figures

Takt time
4,500 s
Lead time
7.96 d
Value-added time
17,010 s
Process cycle efficiency (PCE)
7.9%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
6 cases
Line capacity per day
4 cases
Bottleneck
150kW Overhead Gantry Wire

Reading the bottleneck

The bottleneck is "150kW Overhead Gantry Wire": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 40.5%. Once downtime and scrap are counted, its cycle time grows from 4,860 s to 6,050 s, against a takt of 4,500 s. The largest loss at this step is changeovers (30 min every 2 units), about 900 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.