Substation IEC-61850 Protection Relay Maintenance

Product family: Zero-Misoperation Trip Audit.

Flow: Relay Test Sets → Trip Coil Isolation Link Open → Secondary Current Fault Inject → GOOSE Fiber Latency Measure → Battery DC Trip Voltage Check → Link Reclose & Sign-Off → Transmission Substations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Substation IEC-61850 Protection Relay MaintenanceSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Relay Test Sets → Trip Coil Isolation Link Open (636 s) → Secondary Current Fault Inject (752 s) → GOOSE Fiber Latency Measure (1,041 s) → Battery DC Trip Voltage Check (733 s) → Link Reclose & Sign-Off (482 s) → Transmission Substations.SUPPLIERRelay Test SetsI1.79 d1Trip CoilIsolation Link…C/T 636 sI1.61 d2Secondary CurrentFault InjectC/T 752 sI2.21 d3GOOSE FiberLatency MeasureC/T 1,041 sI0.89 d4Battery DC TripVoltage CheckC/T 733 sI0.39 d5Link Reclose &Sign-OffC/T 482 sI0.50 dCUSTOMERTransmissionSubstations28 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Trip Coil Isolation Link Open636 s15 min96%95.8%850 (1.79 d)34
2. Secondary Current Fault Inject752 s20 min93%97.6%1145 (1.61 d)29
3. GOOSE Fiber Latency Measure1,041 s30 min85%94.5%862 (2.21 d)16
4. Battery DC Trip Voltage Check733 s12 min94%97.8%625 (0.89 d)30
5. Link Reclose & Sign-Off482 s5 min98%99.4%311 (0.39 d)49

Key figures

Takt time
964 s
Lead time
7.53 d
Value-added time
3,644 s
Process cycle efficiency (PCE)
1.8%
Rolled throughput yield (RTY)
85.9%
Customer demand per day
28 units
Line capacity per day
16 units
Bottleneck
GOOSE Fiber Latency Measure

Reading the bottleneck

The bottleneck is "GOOSE Fiber Latency Measure": it can process 16 units per day against a demand of 28 units, so it falls short of demand by 43.0%. Once downtime and scrap are counted, its cycle time grows from 1,041 s to 1,296 s, against a takt of 964 s. The largest loss at this step is changeovers (30 min every 8 units), about 225 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.